ARTIC•LL' 10 • ('I IAMAIi 114 1111: WORK CLAINIS
<br />10.01 Iurhort:ell Changes ur flit, 11'01k
<br />A. Without invalidating the Contractand \Wliou! notice
<br />to any surety, Owner mal, at any bine or from time to
<br />time• order additions, deletions, or revisions in the Work
<br />b} a Change. Order, ora Afork Change Direclis-e. Upon
<br />receipt ol'any such docmnent, Contractor shall promptly
<br />proceed with the ;Poul, involved swhrch will be performed
<br />under the applicable conditions of the Contract
<br />Documents (except as otherwisc spccificaliiy provided).
<br />13. If Owner and Contractor are unable to agree on
<br />")titlement ill, or oil the arilo nit or extent, it'arly, of, an
<br />adjustment in the Contract act Pricc or Contract fillies, or
<br />both, that should be allowed as i result of a Work Citing,
<br />Directive, it Claim nim be made therefor as provided in
<br />Paragraph 10.0.
<br />W.02 t. ?iawhorr_e(1('hrrrrl;t•.s in tire 1Vw-4
<br />A Contractor shall not be entitled to an increase in the
<br />Contract Price or an extension (if the Contract 1'irnes with
<br />respect to any %%vrk performed that is not required by the
<br />Contract Documents as amended, modified, or
<br />supplemented is provided in Paragraph 3.04, except in the
<br />case of an emergency as provided in Paragraph 6.16 or in
<br />the case of uncovering Work as provided in Paragraph
<br />13,04.13.
<br />10.03 Grerumr of Charilre [hders
<br />A Owner and Contractor shall execute appropriate
<br />Char -we Orders trcommended by Engineer covering:
<br />I. changes in the Work which are: (i) ordered by
<br />Owner pursuant to Paragraph 10.01.A, (ii) required
<br />because of acceptance of defecti%e Work under
<br />Paragraph 1,3.08.A or O\% tier's correction of
<br />defective Work under i'aragraph 13.04, or (lii) agreed
<br />to by the patties;
<br />2. tli;angcs in the Contract Price lir Contract Times
<br />which are agreed w by (tic parties, including any
<br />undisputed sarin or amount 01'0111C lot Work actually
<br />performed in accofillance with it Work Change
<br />Directive; and
<br />ch;angs in the Contract Price or Contract Tilnc�-
<br />whrch embody the iubstarlte of art\ written decision
<br />rendered b% 1.ngineer pursuant to Paragraph 10.04,
<br />pro%ided that, ill lieu (it' CXCcming any Stith ('hank.
<br />Ctidcr, an appeal slay be taken riots an% such d,cl-
<br />4111 In acctldan.e will the jll,Msiuns of the
<br />Conuact DocurllemS and applicable Laws .and
<br />Itvgulallolu, b'at dt:rilly un su it appeal. Contractor
<br />shall carr% on the i4ork and -adhere to tire I'ro cess
<br />`;thedule .xs [)moiled in falai laph t>-IB-A-
<br />I(lA•i V'ulllit'llowl to .brei
<br />A. I►'noticc tit any change allecting the },nerd scope of
<br />the WorK or the pros isions of the Contract Llocuntcnts
<br />(including, but not limited to. Contract iIIice or Conlract
<br />Fillies) is required by the pro%isrons of any bond to be
<br />given to a sure(y, the eiving of any such ns'tace %sill he
<br />C'ontractor's responsibility. I he amount of each
<br />applicable bond will be adjwted w reflect the efli:o of
<br />.nv such Change.
<br />Moi C lalms
<br />A. F.ngmee:•'.% 1)ecinon Requo- <i: -111 Claims. cxceltl
<br />those waived pursuant to Paragraph I f.ti shall t,c
<br />referred to the Engineer for decision. A decision by
<br />Flngmccr she " a>e required as a tu,ndilion precedent k% anv
<br />eserci,c by O*weer or Contractor of any rights or remedies
<br />either nlay otherwise have under (fie Contract Documents
<br />or by Lims and Remilations in respect of such Claims
<br />13. Notice written notice statim; the Lencral nature ui
<br />each Claim shall be delivered by the cktitrrant to t:ngineer
<br />and the other party to the Contract promptly (btu in no
<br />event hoer than 30 days) atter the stall of 0re event Living
<br />rise thereto Ilse eespormihility to substantiate a ( taint
<br />shalt rest with the parte snaking the Clain, Notice of'the
<br />amount or extent of the Claim, %lith supporting data shall
<br />be delivered to the Engineer and the other party to the
<br />Contract within 60 days after file start of such cvctll
<br />(unless foginecr allows additional time for claimant to
<br />submit additional or more accurate darn in support of such
<br />C"laim). A Claim for an adjusmlent in Contract Price shall
<br />be prepared in accordance %with the provisions tit
<br />Paragraph 12.OI.B. A Charm tier an adltasuncnt u1 Contract
<br />1 isle shall be prepared in accordance w%ull the provasiorii
<br />of paragraph 12.02.B. Each Claim shall be :iccompanied
<br />by claimant's written statement that file adjustment
<br />claimed is tilt: entire adjustment to -Mach the clairnattt
<br />believes it is entitled as it result of said es em. 'I he
<br />opposing party shall submit ally response to linginecr and
<br />the claituam within 30 days atter receipt of the claimant's
<br />fast submittal (unless Lngineer alto%%s additional fimei.
<br />C Vngm e7-",, - piton; Higincer %will resie%w ca,11 Clain:
<br />and. within 30 days atter receipt ofthe last submittal of
<br />the claimant or the last submittal of the opposirw party, iC
<br />any, tale one of the tollns%inc action: in writing.
<br />I. deri\ the Claim in whole ur in part.
<br />2 approve the Claini, or
<br />nolik (lie parties that the L.rl• nivvi is tmat* to
<br />rvso►%t• (he Clain, it, ul tilt focin%;r\ „ do tfiscrelion,
<br />it would be iimpprvpiate for the iill tincrr to do so.
<br />1 or purpo.,ts of er furthtoofutrcna of the ( laim, cath
<br />notlte shall be d,cilicutd a deua;tl.
<br />i A tit GrtlTrAl t ventlstEvaRa mr lrrf t � tF+truraRa iR ('tmer�rr.
<br />t epevigkc ,-:0.0 N*twnO":utwn cr l'v rnarx..le,aui l'"gi nfo%(,,I r.it'Ill to light,. -.e-ed
<br />kv'Cif4 - .19
<br />
|