ARTIC•LL' 10 • ('I IAMAIi 114 1111: WORK CLAINIS <br />10.01 Iurhort:ell Changes ur flit, 11'01k <br />A. Without invalidating the Contractand \Wliou! notice <br />to any surety, Owner mal, at any bine or from time to <br />time• order additions, deletions, or revisions in the Work <br />b} a Change. Order, ora Afork Change Direclis-e. Upon <br />receipt ol'any such docmnent, Contractor shall promptly <br />proceed with the ;Poul, involved swhrch will be performed <br />under the applicable conditions of the Contract <br />Documents (except as otherwisc spccificaliiy provided). <br />13. If Owner and Contractor are unable to agree on <br />")titlement ill, or oil the arilo nit or extent, it'arly, of, an <br />adjustment in the Contract act Pricc or Contract fillies, or <br />both, that should be allowed as i result of a Work Citing, <br />Directive, it Claim nim be made therefor as provided in <br />Paragraph 10.0. <br />W.02 t. ?iawhorr_e(1('hrrrrl;t•.s in tire 1Vw-4 <br />A Contractor shall not be entitled to an increase in the <br />Contract Price or an extension (if the Contract 1'irnes with <br />respect to any %%vrk performed that is not required by the <br />Contract Documents as amended, modified, or <br />supplemented is provided in Paragraph 3.04, except in the <br />case of an emergency as provided in Paragraph 6.16 or in <br />the case of uncovering Work as provided in Paragraph <br />13,04.13. <br />10.03 Grerumr of Charilre [hders <br />A Owner and Contractor shall execute appropriate <br />Char -we Orders trcommended by Engineer covering: <br />I. changes in the Work which are: (i) ordered by <br />Owner pursuant to Paragraph 10.01.A, (ii) required <br />because of acceptance of defecti%e Work under <br />Paragraph 1,3.08.A or O\% tier's correction of <br />defective Work under i'aragraph 13.04, or (lii) agreed <br />to by the patties; <br />2. tli;angcs in the Contract Price lir Contract Times <br />which are agreed w by (tic parties, including any <br />undisputed sarin or amount 01'0111C lot Work actually <br />performed in accofillance with it Work Change <br />Directive; and <br />ch;angs in the Contract Price or Contract Tilnc�- <br />whrch embody the iubstarlte of art\ written decision <br />rendered b% 1.ngineer pursuant to Paragraph 10.04, <br />pro%ided that, ill lieu (it' CXCcming any Stith ('hank. <br />Ctidcr, an appeal slay be taken riots an% such d,cl- <br />4111 In acctldan.e will the jll,Msiuns of the <br />Conuact DocurllemS and applicable Laws .and <br />Itvgulallolu, b'at dt:rilly un su it appeal. Contractor <br />shall carr% on the i4ork and -adhere to tire I'ro cess <br />`;thedule .xs [)moiled in falai laph t>-IB-A- <br />I(lA•i V'ulllit'llowl to .brei <br />A. I►'noticc tit any change allecting the },nerd scope of <br />the WorK or the pros isions of the Contract Llocuntcnts <br />(including, but not limited to. Contract iIIice or Conlract <br />Fillies) is required by the pro%isrons of any bond to be <br />given to a sure(y, the eiving of any such ns'tace %sill he <br />C'ontractor's responsibility. I he amount of each <br />applicable bond will be adjwted w reflect the efli:o of <br />.nv such Change. <br />Moi C lalms <br />A. F.ngmee:•'.% 1)ecinon Requo- <i: -111 Claims. cxceltl <br />those waived pursuant to Paragraph I f.ti shall t,c <br />referred to the Engineer for decision. A decision by <br />Flngmccr she " a>e required as a tu,ndilion precedent k% anv <br />eserci,c by O*weer or Contractor of any rights or remedies <br />either nlay otherwise have under (fie Contract Documents <br />or by Lims and Remilations in respect of such Claims <br />13. Notice written notice statim; the Lencral nature ui <br />each Claim shall be delivered by the cktitrrant to t:ngineer <br />and the other party to the Contract promptly (btu in no <br />event hoer than 30 days) atter the stall of 0re event Living <br />rise thereto Ilse eespormihility to substantiate a ( taint <br />shalt rest with the parte snaking the Clain, Notice of'the <br />amount or extent of the Claim, %lith supporting data shall <br />be delivered to the Engineer and the other party to the <br />Contract within 60 days after file start of such cvctll <br />(unless foginecr allows additional time for claimant to <br />submit additional or more accurate darn in support of such <br />C"laim). A Claim for an adjusmlent in Contract Price shall <br />be prepared in accordance %with the provisions tit <br />Paragraph 12.OI.B. A Charm tier an adltasuncnt u1 Contract <br />1 isle shall be prepared in accordance w%ull the provasiorii <br />of paragraph 12.02.B. Each Claim shall be :iccompanied <br />by claimant's written statement that file adjustment <br />claimed is tilt: entire adjustment to -Mach the clairnattt <br />believes it is entitled as it result of said es em. 'I he <br />opposing party shall submit ally response to linginecr and <br />the claituam within 30 days atter receipt of the claimant's <br />fast submittal (unless Lngineer alto%%s additional fimei. <br />C Vngm e7-",, - piton; Higincer %will resie%w ca,11 Clain: <br />and. within 30 days atter receipt ofthe last submittal of <br />the claimant or the last submittal of the opposirw party, iC <br />any, tale one of the tollns%inc action: in writing. <br />I. deri\ the Claim in whole ur in part. <br />2 approve the Claini, or <br />nolik (lie parties that the L.rl• nivvi is tmat* to <br />rvso►%t• (he Clain, it, ul tilt focin%;r\ „ do tfiscrelion, <br />it would be iimpprvpiate for the iill tincrr to do so. <br />1 or purpo.,ts of er furthtoofutrcna of the ( laim, cath <br />notlte shall be d,cilicutd a deua;tl. <br />i A tit GrtlTrAl t ventlstEvaRa mr lrrf t � tF+truraRa iR ('tmer�rr. <br />t epevigkc ,-:0.0 N*twnO":utwn cr l'v rnarx..le,aui l'"gi nfo%(,,I r.it'Ill to light,. -.e-ed <br />kv'Cif4 - .19 <br />