Subcontractor and Contractor will each be paid it
<br />Ice of five percent of the annouttt pard to the next
<br />lu-cr tier Subcontractor;
<br />d. no lee shall be payahle oil the basis of costs
<br />itemized under Poragiaphs 11 'I •\ •1, t 1.01.,\ 5,
<br />and 11.01.11;
<br />e. the 311100111 of credit to be allowed b\
<br />Contractor to Owner for ,tn; change: tEhicii
<br />rest<Its in ,► net dMi'ase in cost \\ill be tine
<br />amount of the actual net decrease in coal plus ;t
<br />liedtcli011 in Contractor's fee by an amount equal
<br />to five Itetceirt til such ±tet decrease, incl
<br />L when both additions and credits are involved
<br />it' any one chanf;c, tine adjustment in
<br />Contractor's fee shall be computed on the basis
<br />of the net change in accordance \siih Paragraphs
<br />12:01.C.2.a through 12.ol.C.2.e, inclusive.
<br />12.02 C'hwige c) C'otttruc•t TwIcS
<br />A. The Contract files may only be changed by a Change
<br />Order. Any Claim Jitr an adjustment in the Contract
<br />"lines shall be based on wrilten notice submitted by the
<br />party making the Claim to the Engineer and the other
<br />party to the Contract in accordance with the provisions of
<br />Paragraph 10.05
<br />B. Any adjustment ofthe Contract 'I i(nes covered b_v a
<br />Change Order or any Claim for an adjustment in the
<br />Contract "rimes will be determined in aceortlance with thv
<br />provisions of this Article 12.
<br />12.01 l kht.v.i
<br />A. Where Contractor is prevented from completing any
<br />pari of the Work wilhin the Contract I'imcs cur to dclaaw
<br />beyond the control ot'Contraclor, the Contract Times will
<br />be extended in an antount equal to the time Ic-st due to
<br />such delay if a Claim is made therefor as provided in
<br />Paragraph 1-1,02 A. Dciays beyond the control of
<br />Contractor shall include. but not he limited to, acts or
<br />neglect by Owncr, acts or neglect of utility owlets or
<br />other contractors performing other tcotk as contetnplatcd
<br />by Article 7, fares, Jloeats, epidemics, abnormal \weather
<br />conditions, or acts of Go&
<br />B. if O\vtter, Frigineer, or o(het contractors or unlit\
<br />ow'nct's pettorming other :work Jbr C)wner as contemplated
<br />by Atticle 7, or anyone for \\pont Uwner is responsible.
<br />delays. distupts, or interferes with tae p,riutn;ance or
<br />progte�s of thr Work. then Coluractor shall tw cntitrd to
<br />all equitable auiustment in tics Coah,rcl Price or the
<br />Cointract 1 tines ,lir holh_ +. Unrt�lttor'� entltiemeol to an
<br />adjusunent A the r, ontrao Fillies is crndtuoncd ort such
<br />.ad_lu illenl being essential to Cc,ntractor's 'iblit, I
<br />cornlplele the 1Votir. within ific Cotatract farads
<br />C. If Contractor is delayed in the perlormance or progwo.
<br />of clic Work b\ fire, flood. cpirlemic, oboonnal wcathcr
<br />conditions, acts of God, acts or failure: to act of unlit\
<br />owners not tinder the control of (wner, or outer cause:,
<br />not the fault of and tic) and control of O\\ net and
<br />Contractor, then Contractor shall be entitled to an
<br />equitable adjustment in C'ontrarl I itne;. if such
<br />adjustment is essential to Coll(raaor's ability to complete
<br />the Wolk wilhin lite Conlrac'. I lines Such an adjustment
<br />shall bc, Contractor's sole and cwhisi\ c rcmcd\ for the
<br />delays described in this Paragraph 1".03 C,
<br />D. Owner, Engineer and the Related Entities of each of
<br />them shall not be liable to Contractor for any Maims.
<br />costs, losses, or damages ( including but not limited to ;t1
<br />fees and cbarites of Engineers, ;architects. anorne\•s. and
<br />other profession lnd all court or atbitrttion or outer
<br />dispute resolution costa) sustained lab C'Urtr;IC(01 tit-] or ant
<br />connection with ;any other project or anticipated project
<br />F. Contiador shall trot be entitled to an adjustment in
<br />Contract Price or Contract Tums fir delaws within the
<br />control cif Contractor. Delays attributable to and \within
<br />the control of a Subcontractor or Supplier shall be deemed
<br />to be delays within the control of Contractor.
<br />ARVICU 13 - ftSTS AND INSI TCfIONS:
<br />C'ORREC!'ION, REMOVAL OR AC'CLP I AN( -'E 01:
<br />DLFLCIIVF WORK
<br />1301 Aotive q i)ele t.v
<br />A. Prompt notice of all defective \York of \which O\\ner
<br />or Engineer has actual knowledge will be given to
<br />Contractor. All detective Work may be rejected.
<br />corrected, or accepted is provided in this Arti;;le 13.
<br />13.02 Access to 11, 11
<br />A. Umict, Enguacer, their unci oiler
<br />representatives ;and personnel of0tvner, indepcndenli
<br />testing laboratories, and gowernnlentai af!encies wtth
<br />Jurisdictional interests will haw access to the site and the
<br />Wolk at reasonable times for their observalnon.
<br />inspecting. and testing Contractot shall p o\ide them
<br />proper and safe conditions for such access anti ad\ i,e
<br />them of Contractor's Site safety piocedurc i and progruns
<br />su drat they may compl\ (herewith as applicable
<br />I I'(ai /,•at\ aml hnkl�ecttoas
<br />-\ Contractor shall gi\e Laginerr umeh nonce of
<br />readincs< of IhC \Volk fQr .til rcqutr,:f mspectic ra:, tea>,
<br />Of :rpprov;ds 31111 -,halt 010l11!r,t1e with in�lytetiun and
<br />Ic'Nlilw pelwilnel to ftac►lmilc required in,pec11011: Or tea,
<br />ner 01AI c;tlplo\ :and pay til the wit, , t an
<br />iII. I;endc•rit te"Aw'.. J;abotalol'. to lac:Ifoi a ,all i,a,J\ccr,als.
<br />l F1 tri t -`iWS '.tilieUa9:arsa l:rn¢r pl l e.�t9ttitam\at1 the f •sanetr aE. a�:*or t aeAafe aei
<br />i ;,�tAa�a,t T ��r;t7 t\;ttla~+se der 'rs.tatt� v{ i"tarr+�iva®t6 if Gsy'ims tie♦ €:..x' t..Qi lig iYe eaksti 1a-ze:�a rpt
<br />ax+�®MP 13
<br />
|