My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will <br />deliver to Owner and Contractor a written recommendation as to division of responsibilities <br />pending final payment between Owner and Contractor with respect to security, operation, <br />safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and <br />guarantees <br />SC -14.07 Final Payment <br />SC -14.07.C.1. Delete paragraph GC -14.07.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the " <br />Local Government Prompt Payment Act", Florida Statutes section 218.70, et. seq. <br />SC -15.01 OWNER May Suspend Work <br />SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its <br />place: <br />CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br />such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br />10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br />CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- <br />nomic loss arising out of or resulting from such Work suspension. <br />SC -15.02 OWNER May Terminate For Cause <br />SC -15.02.A.5 and SC -15.02.A.6 Add the following new paragraphs immediately after <br />paragraph GC -15.02.A.4: <br />5. CONTRACTOR's violation of Section 02225 — "Erosion Control and Treatment of <br />Dewatering Water From the Construction Site." <br />6. CONTRACTOR's failure to make payment to Subcontractors or Suppliers for <br />materials or labor in accordance with the respective agreements between the <br />CONTRACTOR and the Subcontractors or Suppliers. <br />SC -15.04 CONTRACTOR May Stop Work or Terminate <br />SC -15.04 Delete the following text from the first sentence of paragraph GC -15.04.A: <br />SC -15.04 Delete the following text from the second sentence of paragraph GC -15.04.A: <br />.. - . .. .• <br />SC -16 DISPUTE RESOLUTION <br />SC -16.02 Mediation <br />00800-9 <br />00800 - Supplementary Conditions 06-09 rev.doc <br />00800 9F:\Engineering\Capital Projects\0205 Old Dixie Highway Bridge over the South Relief Canal\0205 Contract Documents & Specs\00800 - Supplementary Conditions <br />06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.