My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM #3 4-12-10 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: BRIDGE REPLACEMENT AT OLD DIXIE HWY. OVER SOUTH <br />RELIEF CANAL WITH ROADWAY AND DRAINGE IMPROVEMENTS <br />BIDDERSINg�F`0Rrv~, INC. <br />SIDEWALK <br />339-1 <br />MISCELLANEOUS ASPHALT (SLOPE PROTECTION) <br />1 <br />LS <br />/ • 10 <br />400-2-4 <br />CLASS II CONCRETE <br />67 <br />CY <br />1,Zqp,,, <br />415-1-4 <br />REINFORCING STEEL <br />2,940 <br />LBS <br />l • 7 <br />00 <br />630-1-2 <br />SCH 80 4" PVC PIPE <br />2,940 <br />LF <br />•yd <br />�9 /�f - Ob <br />PIPE CRADLES <br />400-2-5 <br />CLASS II CONCRETE <br />1 <br />Cy <br />tj$D• 00 <br />(pSO • p0 <br />415-1-4 <br />REINFORCING STEEL <br />50 <br />LBS <br />�• �� <br />9�• �� <br />APPROACH SLABS <br />400-8-10 <br />'CLASS 11 CONCRETE <br />100 <br />Cy <br />73 DO <br />33 <br />415-1-4 <br />REINFORCING STEEL <br />21,400 <br />LBS <br />-� <br />a5 �o •0a <br />530-3-3 <br />RIPRAP-RUBBLE <br />2,875 <br />TN <br />qg-q5 <br />13 a73.75 <br />BRIDGE IMPROVEMENTS SUBTOTAL <br />MISCELLANEOUS <br />800 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />"J 0 <br />3 % •na <br />801 <br />TRENCH SAFETY COMPLIANCE (OVER 5') (SEE SEC. <br />00454) <br />1 <br />LS <br />r ' �� <br />i - <br />802 <br />TRENCH SAFETY COMPLIANCE (SHORING) (SEE SEC. <br />00454) <br />1 1 <br />LS <br />I 0 <br />r • 0 <br />MISCELLANEOUS SUB TOTAL <br />OLD DIXIE HIGHWAY OVER SOUTH RELIEF <br />CANAL ROAD IMPROVEMENTS TOTAL <br />13 Ir 9•D <br />`�9q• <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton <br />ED = Each Day CY = Cubic Yards LBS = Pounds AS = Assembly <br />NOTE: IF THERE IS A DISCREPENCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID DOCUMENTS WILL GOVERN. <br />e e_,,. -..........,r,...... o.,.......�,nonc — n... _-._..__.. I --- 1,—.,--'-- � 1__._,.r1-11 , — 1-1,. - . nngi LR <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.