Laserfiche WebLink
0 <br />J <br />Ll <br />i <br />fl <br />e <br />0 <br />E <br />0 <br />HI <br />IA <br />The determination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the BIDDER. Such methods will not be checked by the OWNER or <br />ENGINEER for accuracy, completeness or any other purpose. The OWNER and <br />ENGINEER shall have no responsibility to review or check the BIDDER's compliance <br />with the Trench Safety Standards. <br />8) The BIDDER, in submitting this bid, represents that it has obtained and considered all <br />available geotechnical information, has utilized said geotechnical information and that, <br />based on such information and the BIDDER's own information, the BIDDER has <br />sufficient knowledge of the Project's surface and subsurface site conditions and <br />characteristics to assure BIDDER's compliance with the applicable Trench Safety <br />Standards in designing the trench safety system(s) for the Project. <br />BIDDER: i G <br />By: <br />Position or Title: Pi2�5 ��t✓ N rl <br />Date: -J1— d <br />STATE OF FLOP, I -DO <br />COUNTY OF 5 1,11 c,l <br />Personally appeared before me, the undersigned authority, Ld&L/ -r. <br />who after first S> being �yn � me, affixed his/her in the space provided above on this <br />day of �L/f K�% —, 2 <br />0 <br />Notary t'UDIIC, state at la <br />My Commission Expires: <br />Comm# DD059119'► <br />E*res 9/29/201) <br />I-10ft NaWyAw., Inc <br />**END OF SECTION** <br />00454 - Florida Trench Safety Act.doc <br />00454-2 <br />FAEngineering\Capital Projectsh0205 Old Dixie Highway Bridge over the South Relief CanaIt0205 Contract Documents & Specs100454 - Florida Trench Safety Act.doc <br />