My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC CONSTRUCTION BOND <br />Bond No. 105375930 <br />(enter bond number) <br />BY THIS BOND, We Dickerson Florida, Inc. , as Principal and Travelers Casualty <br />and Surety Company of America, a corporation, as Surety, are bound to Indian River County, Florida <br />herein called Owner, in the sum of $ 1.949,922.76 , for payment of which we <br />bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and <br />severally. <br />THE CONDITION OF THIS BOND is that if Principal: <br />1. Performs the contract dated May l l _ 2010 , between Principal and Owner for <br />construction of Prid RegR rtent at ld Dixtn Hi�hv�a�u er,tl�ehlS�Nt Relief Canal with , the contract being <br />oa av n rams m rovemen a <br />made a part of this bond by reference, at the times and in the manner prescribed In the <br />contract; and <br />2. Promptly makes payments to all claimants,. as definod in Section 255.05(l), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal in the prosecution of the work provided for in the contract; and <br />3. Pays ':Owner all losses, damages, expenses, costs, and attorney's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract; and <br />4. Performs the guarantee of all work and materials furnished under the contract for the <br />time spodified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action Instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />DATED ON lune 1, 2010 1 ` �►`p"`� <br />Dickerson Florida, Inc. { �'• ' <br />- N f Pr <br />i al <br />Byoi <br />1 <br />Travelers Casualty and Surety Company of America <br />i• <br />(Name ofSure <br />I/vt <br />AAs Atto ney in Fact ! V 171 t, <br />Karen K. Beard, Attorney -in -Fact and Flonda I fcGnsed Rj,`uV, j <br />00610-3 <br />00610 - Public Construction Bond.doc <br />P1EnpinserinpfCapltel Projectev0206 Old Dixle tiohvrey Brld" over Oro South Relief Cenalv0206 Contract Documents & 3pacs\00610 - Public Construction Bond.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.