My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />CERTIFICATION OF ENGINEER: <br />I certify that I have reviewed the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it appears to be a reasonably <br />accurate statement of the work performed and/or material supplied by the Contractor. I am <br />not certifying as to whether or not the Contractor has paid all subcontractors, laborers, <br />materialmen and suppliers because I am not in a position to accurately determine that <br />issue. <br />Dated <br />SIGNATURE <br />CERTIFICATION OF INSPECTOR: <br />I have checked the estimate against the Contractor's Schedule of Amounts for Contract <br />Payments and the notes and reports of my inspections of the project. To the best of my <br />knowledge, this statement of work performed and/or materials supplied appears to be <br />reasonably accurate, that the Contractor appears to be observing the requirements of the <br />Contract with respect to construction, and that the Contractor should be paid the amount <br />requested above, unless otherwise noted by me. I am not certifying as to whether or not <br />the Contractor has paid all subcontractors, laborers, materialmen and suppliers because I <br />am not in a position to accurately determine that issue. <br />Dated <br />SIGNATURE <br />[The Remainder of This Page Was Left Blank Intentionally] <br />00622 - Contractor's Application for Payment - 03-10 rev ADDENDUM No. 1 <br />00622-4 <br />F:\Engineering\Capital Projects\0205 Old Dixie Highway Bridge over the South Relief Canal\0205 Contract Documents & Specs\00622 - Contractor's Application for Payment - 03-10 <br />rev ADDENDUM No. 1.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.