My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:45:07 PM
Creation date
10/5/2015 9:01:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/11/2010
Control Number
2010-119
Agenda Item Number
8.G.
Entity Name
Dickerson Florida, Inc.
Subject
South Relief Canal Project
Bridge Replacement Old Dixie Highway
Area
South Relief Canal
Project Number
0205
Bid Number
2010038
Supplemental fields
SmeadsoftID
8562
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.02 Each bid must contain evidence of Bidder's qualification to do business in the state <br />where the Project is located or covenant to obtain such qualification prior to award of the contract. <br />3.03 The OWNER reserves the right to reject bids from Bidders that are unable to meet the <br />listed required qualifications. <br />ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND <br />SITE <br />4.01 Subsurface and Physical Conditions <br />A. The Supplementary Conditions identify: <br />1. Those reports of explorations and tests of subsurface conditions at or contiguous to <br />the Site that Engineer has used in preparing the Bidding Documents. <br />2. Those drawings of physical conditions in or relating to existing surface and subsurface <br />structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used <br />in preparing the Bidding Documents. <br />B. Copies of reports and drawings referenced in paragraph 4.01.A will be made available <br />by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract <br />Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as <br />provided in paragraph 4.02 of the General Conditions has been identified and established in <br />paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or <br />conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions or <br />information contained in such reports or shown or indicated in such drawings. <br />4.02 Underground Facilities <br />A. Information and data shown or indicated in the Bidding Documents with respect to existing <br />Underground Facilities at or contiguous to the Site is based upon information and data furnished <br />to OWNER and ENGINEER by OWNERs of such Underground Facilities, including OWNER, or <br />others. <br />4.03 Hazardous Environmental Condition <br />A. The Supplementary Conditions identify those reports and drawings relating to a <br />Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in <br />preparing the Bidding Documents. <br />B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by <br />OWNER to any Bidder on request. Those reports and drawings are not part of the Contract <br />Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as <br />provided in paragraph 4.06 of the General Conditions has been identified and established in <br />paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or <br />conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions, or <br />information contained in such reports or shown or indicated in such drawings. <br />4.04 Provisions concerning responsibilities for the adequacy of data furnished to <br />prospective Bidders with respect to subsurface conditions, other physical conditions and <br />Underground Facilities, and possible changes in the Bidding Documents due to differing or <br />00200 - Instructions to Bidders REV 04-07.doc <br />00200-2 <br />F:\Engineering\Capital Projects\0205 Old Dixie Highway Bridge over the South Relief Canal\0205 Contract Documents & Specs\00200 - Instructions to Bidders REV 04-07.doc <br />Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.