Laserfiche WebLink
The subject addendum was generated from the questions raised by a plan holder. The <br />questions and the answers are indicated below: <br />1. Will 2 -inches of Misc Asphalt be required under guard rail? <br />Response: No. <br />2. Can you give me the contact persons name & number for the NPDES? <br />Response: Information with regards to the NOI can be obtained via FDEP's website <br />(http://www.dep.state.fl.us/water/stormwater/npdes/). If you need any additional <br />information, call Todd Tardiff (IRC Sr. Stormwater Inspector/Enforcement Coordinator) <br />at 772-226-1564. <br />3. The plans show turbidity curtain to be used in the south swale. Swales are currently dry if <br />during construction they remain dry is it acceptable to use staked silt fence? <br />Response: IRC would not recommend deviating from the SWPP plan. Turbidity curtains <br />should be in place in case a rainfall event happens during construction. Also, please <br />note that there is a separate line item in the itemized bid schedule for turbidity curtain. <br />4. Other than the NPDES permit are the contractors going to be required to obtain any other <br />permits? <br />Response: The contractors may be required to obtain a Consumptive Use Permit (CUP) for <br />dewatering. <br />5. The bid item schedule has been revised to include Reflective Pavement Markings <br />(RPM's) (Item 25A on Itemized Bid Schedule). <br />Attachments: <br />Itemized Bid Schedule, Revised March 05, 2010 <br />Page 2 of 3 <br />F.•iPublic WorksI ENGINEERING DIVISION PRDJECTS10946-47TH Street (USI to Terminus Point) I Admiml bid documents) Addendum No. 1 03-05- <br />10. do c <br />