My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-108A
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-108A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:12:55 AM
Creation date
10/5/2015 9:02:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-108A
Agenda Item Number
8.N.
Entity Name
Clinton Barker Land Development 47th Street Roadway Improvements
Subject
Contract and Specifications, East of US 1 to Terminus Point
Area
47th Street
Project Number
0946
Bid Number
2010033
Supplemental fields
SmeadsoftID
8636
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The subject addendum was generated from the questions raised by a plan holder. The <br />questions and the answers are indicated below: <br />First, the plan notes that we are to verify that there is three (3) feet of buried post. I do not think it <br />is reasonable to require this. In order to determine the depth of the existing post it would need to <br />be disturbed, if it is disturbed it will damage the integrity. <br />Second, the proposed modification to the existing posts has been questioned by each of my <br />guardrail contractors. None of them are willing to take the risk and construct as shown. <br />We would suggest that the proposed modification would be more time consuming and put us at <br />greater risk than simply using new posts with 3 feet of buried (no need to disturb existing and <br />then try to re -use) and attaching the existing rail to the new posts. Will this be acceptable? <br />We agree that anything less will result in an unacceptable finished product. <br />Please clarify if all guardrail is to be adjusted or only that at the proposed curb locations per <br />detail. <br />Response: An alternate line item has been added to the Itemized Bid Schedule to include <br />guardrail reset with new post per FDOT Index 400 (Line Item 16A under Alternate Bid <br />Item). Please note that this alternate bid would be in lieu of line item 16 in the Itemized <br />Bid Schedule. All applicable design standards per FDOT Index 400 must be met. <br />Furthermore, line items 16 and 16A are for the entire length of guardrail. <br />Attachments: <br />Itemized Bid Schedule, Revised March 19, 2010 <br />Page 2 of 3 <br />F:•lPubiic WorksIENGINEERING DIVISION PROJECTSI0946-47TH Street (USI to Terminus Point)lAdmimlbid documentst4ddendum No. 3 03-18- <br />10. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.