My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-108A
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-108A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:12:55 AM
Creation date
10/5/2015 9:02:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-108A
Agenda Item Number
8.N.
Entity Name
Clinton Barker Land Development 47th Street Roadway Improvements
Subject
Contract and Specifications, East of US 1 to Terminus Point
Area
47th Street
Project Number
0946
Bid Number
2010033
Supplemental fields
SmeadsoftID
8636
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />Bid No.: 2010033 <br />Project: 47thStreet Roadway Improvements east of US 1 to Terminus Point <br />Project No. 0946 <br />CONTRACT FOR: 47th Street Roadway Improvements east of US 1 to Terminus Point <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To. <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within days <br />of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07.doc <br />00630 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \0946-47T1-1 Street (USI to Terminus Point)VAdmim\bid documents\0946 Contract Documents\00630 - Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.