My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-108A
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-108A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:12:55 AM
Creation date
10/5/2015 9:02:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-108A
Agenda Item Number
8.N.
Entity Name
Clinton Barker Land Development 47th Street Roadway Improvements
Subject
Contract and Specifications, East of US 1 to Terminus Point
Area
47th Street
Project Number
0946
Bid Number
2010033
Supplemental fields
SmeadsoftID
8636
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.08 Permits <br />22 <br />6.09 Laws and Regulations 22 <br />6.10 Taxes 22 <br />6.11 Use of Site and Other Areas 22 <br />6.13 Safety and Protection 23 <br />6.14 Safety Representative 23 <br />6.15 Hazard Communication Programs 23 <br />6.16 Emergencies 24 <br />6.17 Shop Drawings and Samples 24 <br />6.18 Continuing the Work 25 <br />6.19 CONTRACTOR's General Warranty and Guarantee 25 <br />6.20 Indemnification 25 <br />ARTICLE 7 - OTHER WORK <br />26 <br />7.01 Related Work at Site 26 <br />7.02 Coordination 27 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES 27 <br />8.01 Communications to Contractor 27 <br />8.02 Replacement of ENGINEER 27 <br />8.03 Furnish Data 27 <br />8.04 Pay Promptly When Due 27 <br />8.05 Lands and Easements; Reports and Tests 27 <br />8.06 Insurance 27 <br />8.07 Change Orders 27 <br />8.08 Inspections, Tests, and Approvals 27 <br />8.09 Limitations on OWNER's Responsibilities 27 <br />8.10 Undisclosed Hazardous Environmental Condition 28 <br />8.11 Evidence of Financial Arrangements 28 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 28 <br />9.01 OWNER'S Representative 28 <br />9.02 Visits to Site 28 <br />9.03 Project Representative 28 <br />9.04 Clarifications and Interpretations 28 <br />9.05 Authorized Variations in Work 28 <br />9.06 Rejecting Defective Work 29 <br />9.07 Shop Drawings, Change Orders and Payments 29 <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work 29 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities 29 <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 30 <br />10.01 Authorized Changes in the Work 30 <br />10.02 Unauthorized Changes in the Work 30 <br />10.03 Execution of Change Orders 30 <br />10.04 Notification to Surety 30 <br />10.05 Claims and Disputes 31 <br />ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK 31 <br />11.01 Cost of the Work 31 <br />11.02 Cash Allowances 33 <br />11.03 Unit Price Work 33 <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 34 <br />00700 - General Conditions REV 04-07.doc <br />00700 - 3 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \0946 -47TH Street (USI to Terminus Pomt)1Admim\bid documents\0946 Contract Documents\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.