My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (02)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (02)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 4:31:25 PM
Creation date
10/5/2015 10:01:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (2)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030 Comprehensive Plan
Chapter 3E Stormwater Management Sub-Element
Supplemental fields
SmeadsoftID
13454
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C ampreh unsive Plan Sllormmiller Managemenil Sub -Element <br />Folksy 13: Ely X112, all dnainaga basins w:ilhin the ciounq shall mieiet a 110 year /24 hour <br />storm eivient level-af�serv:icie standard. <br />Policiy a.4: The county shall naquira all neva develapmarit sates to bei dasignad with ncilentian <br />systems capable afI acicommiadating 1.af1 timers thea imparv:iaus surftacie araa, or 0._`I inahes <br />1 imes 1 ha pnoj acct area. <br />PolJoy 2._`I: Ely 2012, the ciounty will adapt a Stormwatar Master Plan. In davaloping tho <br />Starmwatar M astaii Alan, tha county wall anaalyza eacih basin in the unincorporated county, <br />identify axisling conditions and prab:lams in eaciLl basin, and idenat:ify prajactac grcawth in <br />each basin. As a result aflthat analysis, tho county will ideritify a design storm parameter, <br />disciharge nates, land use allawancia, and strucitural :imipnavcamiant plan fear eacih tas:in. Tha <br />county veil] coordinate with tho Clity ofl Sebastian, anc will priaritize analysis aflthe aaaaas <br />within and adjacienit to tha St. Sebaslian Riviera basin. <br />Aollicy 3.6: 'flu ensures stormwater managament fkillitieas f ration properly, the ciounty will <br />establish cefined leveals of maintananeie far publics and privata stormwater management <br />faciilitieas, and will conduct inspocitions on a nout:inca basis. <br />Ilalicy 2.7: The ciaunty willl, thilough pits lane dovulopment regulations, require ex:istiing uses <br />undargoing rudevalopmenit to menet dle micast ounieanat devalopment vaquiremer.its for <br />stormwater mianagemieanit. <br />lllolicy 1fl 'Ahea ciounq wall conit:inuea:its acitiv:ilies to retrofitthca Veno Lakcas Estates dnaainiagca <br />systam. <br />Ploligy 2.9: By 20112, lha cicaunt)l will conduct a ciompnehar.is:iva inveantary of all stormwater <br />mianagemunt facilities in all of the dra:inaga sub -basins under the county's jur:isdicilioni. <br />Policy 2.10: Ely 2012, the counity shall establish a Gu agraph:ici Ir.iftarmiatian System 11G.l.S.) - <br />t awed inviantory cif all stormwaten mianagemiear.it f4ail:ities under the ciounty's jurisdictions. <br />Q HJEICT]IVE ?I Capital Impromements <br />By 2012, Indian Riven County will have ani ad eapted Stormwiater Masten Plani, which wil 1 gu i do <br />all imI ncavemenits to stormwiater management facailities in Ind join Rimer County omer a 2a1 Y1c vin <br />time 11rume. <br />Community Deve cipmenil Der artmenil Indifin IPiver Coun ty 4C <br />
The URL can be used to link to this page
Your browser does not support the video tag.