Laserfiche WebLink
C olmpreh emaive Plant Sterrriwlater Manlagement Sul-Hlernertll <br />TABLE 1 <br />Stormwater Management Sulb-Elemflnt Impllamentalllialn Matrix <br />Aolicy <br />Type ofAction <br />Rea 11 ansibility <br />Timing <br />ClapitalINpenditura <br />1.1 <br />Alda It 25 ye a v124 hour slorm event a 9 AOS standard <br />Aublic Worl s <br />Ongoing <br />NO <br />ibi all new dra ina ge iyslems <br />1.2 <br />Regulate construction in EIHMA flood zones <br />Aublic WonksjCorn munity <br />Ongoing <br />NO <br />Deve la Imenl Depa rtrr ent <br />1.3 <br />Hmune adequate SWIM facilities ane constiucted and <br />Aublia Worl s <br />Ongoing <br />YES <br />maintained to pnevenl sheet flooding <br />1.4 <br />Design storm sewais to aanncy discharge aflei <br />Public Worl <. <br />Ongoing <br />NO <br />ta ilwa ler conditions ara considered <br />1.5 <br />L esign bi idgcs ilo wilhsland 100 yeai,B day slorm <br />Aublia Worl s <br />Ongoing <br />NO <br />1.6 <br />Coordinate sizing of culverts wits FIS 298 Districts <br />public Woi ks/FIS 29 8 <br />Speaial L istricls <br />Ongoing <br />NO <br />1.7 <br />Requirc wide drainage easements in subdivisions <br />Aublia'Alorks/Planning <br />Ongoing <br />NO <br />without retention, deilerilion facilities <br />1.8 <br />Require all SWM facilities outfalling to FS 299 <br />But Iia 'Alorks/Planning <br />Ongoing <br />NO <br />District canals be aomplelecl prior to CI.CI. issuance <br />Reconstruct existing daainage syslems and awlore <br />2.1 <br />design cagacity of roads under Pel itis n Paving <br />Aublic Worl s <br />Ongoing <br />YES <br />program <br />2.2 <br />Ilmpiove AOS slandauds fai roads <br />Aublic Worl s <br />2020 <br />YES <br />2.3 <br />LCIS itarulards Eoi all drainage basins <br />Aublia Worl s <br />2020 <br />YES <br />Require new developmenl ,files 1a accommodale 1.25 <br />2.4 <br />limes the imilarvious surlaea area or 0.1 inches limes <br />Aublic Worl s <br />Ongoing <br />NO <br />the projaatarea. <br />2.5 <br />Adopt SlormwalenMaftanAlan <br />Aullie 'Alorks/Planning <br />2012 <br />NO <br />2.6 <br />Establish defined levels ofmaintanance and eanduat <br />Aublia Worl s <br />Ongoing <br />NO <br />nautine infpaclions ofSWly laoililies <br />Re quit a existing developmenlf under going <br />2.7 <br />radevelopmenl 1a mec l iequiiements for nev <br />But lie'Alorks/Planning <br />Ongoing <br />NO <br />developmenl <br />2.8 <br />Rabofil Vaioflake Hsilalei chainaga system <br />Aublia Works <br />Ongoing <br />ii HS <br />2.9 <br />Conducl inveniloq 1 a II SWM faciliil ies under county <br />Aublia Works <br />2012 <br />NCI <br />jurisdiction <br />2.10 <br />F slablish a G.I.S.-based inncnlaryl ofSWM facilities <br />Aublia Works <br />2012 <br />NCI <br />under county.jm isdiclion <br />1.1 <br />Include SWIM facility irrpranamant program in the <br />Aublic Waiks/Planning <br />Ongoing <br />NCI <br />C olmmulnlilly Develallnriert9 Heprllmlertll Inclianl River Couinly Z I <br />