My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (03)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (03)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 4:33:46 PM
Creation date
10/5/2015 10:01:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (3)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030 Comprehensive Plan
Chapter 4 Transportation Element
Supplemental fields
SmeadsoftID
13455
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Transportation Element <br />With a maximum estimated clearance time of 10 '/z hours for worst case conditions in the most <br />severe storm event, the County's clearance time is within the generally accepted standard of 12 <br />hours. Recently, a SR AIA Corridor Study was done for the south part of the County's barrier <br />island, and that study addressed hurricane evacuation issues. Using conservative assumptions, <br />that study confirmed that existing evacuation times were adequate. <br />Since the hurricane study update, several actions have been taken which enhance evacuation <br />even more. Most importantly, the old two lane, movable span Merrill Barber Bridge was <br />replaced with a four lane, high rise, fixed span facility. This has significantly improved barrier <br />island evacuation travel and delay times. Also, improvements have been made to SR 60 both <br />east and west of I-95. East of I-95, SR 60 is in the process of being widened to 6 lanes between <br />66th Avenue and I-95. This will result in a continuous 6 lane facility from Indian River <br />Boulevard to I-95. West of I-95, SR 60 has been widened to a four -lane divided facility between <br />I-95 and the Florida Turnpike entrance in Yeehaw Junction. <br />Landscaping and Aesthetic Improvements in Transportation Corridors <br />In order to make roadways aesthetically pleasing and compatible with surrounding land uses, <br />Indian River County has enacted various regulatory measures and programmed roadway <br />landscape improvements One such measure was the adoption of corridor plans. Since approval <br />of the original county corridor plans (which applied to SR 60 and CR 510), the county has <br />expanded the number of corridor plans to include most of the county's major arterial corridors. <br />These corridor plans include architectural standards (such as acceptable roof materials and exterior <br />colors), buffering requirements, landscaping requirements, and signage provisions. Finally, the <br />county has amended its Land Development Regulations to ensure that private developments feature <br />extensive landscape improvements fronting public roadways. <br />Currently, there are a number of landscaped transportation corridors in the county. Generally, state <br />corridors contain more landscaping than county corridors. For example, SR60 is landscaped at the <br />entrance to I-95, has trees on berms west of I-95, and has landscaped medians between 20th and 58th <br />Avenues. Proposed projects such as the widening of SR 60 between 66th Avenue and I-95 and the <br />resurfacing of SR 60 from 20th Avenue to SR AlA will also involve installation of extensive <br />median and shoulder landscaping. <br />Probably the longest corridor within Indian River County with near -continuous landscaping <br />treatments is SR AlA. Along that corridor, much of the landscaping was provided by private <br />developers on public or private rights-of-way through agreements with FDOT. Other state <br />roadways in Indian River County have been redesigned with decorative pedestrian amenities to <br />further enhance aesthetics. Along US 1 within the Sebastian city limits, for example, landscaping is <br />complemented with paver block crossings, decorative lighting, and matching street furniture. <br />Currently, several major county roadways are being designed to accommodate landscaping <br />treatments. These include CR 510, 66th Avenue, and 43r Avenue, all of which are being designed to <br />include landscaped medians and curb and gutter sections to accommodate landscaped shoulders. In <br />the city of Sebastian, the county's recently completed CR 512 widening project included an <br />extensively landscaped 15' buffer and trail from Roseland Rd to the Sebastian Elementary School. <br />Community Development Department Indian River County 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.