My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (03)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (03)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 4:33:46 PM
Creation date
10/5/2015 10:01:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (3)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030 Comprehensive Plan
Chapter 4 Transportation Element
Supplemental fields
SmeadsoftID
13455
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Transportation Element <br />Landscaping and Aesthetic Improvements in Transportation Corridors <br />Acknowledging the significance of landscaping to the quality of life of the traveling public and to <br />surrounding neighborhoods, the county has begun to expend significant funds on landscaping for <br />county roadway projects. In fact, the county's commitment to landscaping its roadways is almost <br />3% of total project cost, close to what FDOT's landscaping costs average on roadway construction <br />and resurfacing projects. <br />In much the same way as developers provide sidewalks, many private developers provide <br />landscaping improvements adjacent to major road rights-of-way. In most cases, these <br />improvements are required by Indian River County's adopted Land Development Regulations and <br />Corridor Plans. <br />In addition to landscaping, other factors (such as buffering, adjacent land uses, and architectural <br />styles) affect the appearance and functionality of a roadway. One technique for improving the <br />appearance of corridors is the adoption of corridor plans. In November of 1995, the county adopted <br />its first corridor plan, the Wabasso corridor plan. Since that time, other corridor plans have been <br />enacted. Now, corridor plans apply to all of the county's principal arterials and many of its other <br />major roadways. While the details of these plans vary by corridor, all of the plans contain <br />regulations on permitted activities, landscaping, architectural guidelines, outdoor advertising, and <br />other elements that may improve a neighborhood's overall aesthetics. <br />At this time, landscaping is now a standard feature of the county's roadway improvement <br />projects. In Indian River County, the cost of landscaping (including plant materials, irrigation <br />hardware, and installation) varies between $100,000/mile for a minimal installation of trees and <br />paver blocks to $250,000/mile for a design that includes trees, understory plantings, and turf <br />grass. It should be noted, however, that the true cost of landscaping is usually much higher, <br />depending on the availability of right-of-way necessary to support the landscaping. For example, <br />the standard minimum FDOT urban roadside typical section for a four -lane roadway specifies <br />that, in addition to right-of-way needed for sidewalks, utility easements, and horizontal <br />clearance, a minimum of 8 feet of right-of-way (2.4 meters) is needed for roadside trees within <br />road rights-of-way. Hence, the cost of right of way needed for landscaped shoulders adjacent to <br />roadways could cost between $100,000 and $1,000,000 per mile (based on right of way costs of <br />$2 sq. ft. in rural areas to $26 sq. ft. in urban commercial areas). According to the 2030 Long <br />Range Transportation Plan, there will be approximately 40 centerline miles of new roadway <br />needing right-of-way in the next twenty years. <br />The Florida Highway Landscape Guide, an FDOT publication authorized by 339.24, F.S., states <br />that "Local Government Comprehensive Plans should include a section on aesthetic treatments <br />of streets and highways." The 2025 Florida Transportation Plan (FTP) further recommends that <br />the landscaping materials used on projects be compatible with adjacent landscaping on nearby <br />parcels. Going forward, the county's policy should be to establish minimum expenditure levels on <br />landscaping in conjunction with roadway projects where ample right-of-way can be easily obtained; <br />incorporate idealized typical sections into roadway designs; and establish a procedure for roadway <br />and transit facility aesthetic design review. <br />Community Development Department Indian River County 87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.