My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/17/1981
CBCC
>
Meetings
>
1980's
>
1981
>
6/17/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:11:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/17/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 171991 BOOK 46 PAGuE 707 <br />CHANGE <br />OWNER <br />ARCHITECT <br />B <br />ORDER <br />CONTRACTOR <br />FIELD <br />❑ <br />A/A DOCUMENT_ 0701 <br />I <br />OTHER <br />PROJECT: Indian River County <br />(name, address) Administration Building <br />TO (Contractor) <br />Reinhold Construction Inc. <br />P.o.Box 666 <br />Cocoa, FL 3'-922 <br />CHANGE ORDER NUMBER: 39 <br />7 ARCHITECT'S PROJECT NO:9363 <br />CONTRACT FORAdd i t ions and Renovations <br />L J CONTRACT DATE:4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -69 Please submit your quotation to install transfer grills and fire <br />dam?ers as shown on Dwas M-17, M-18'& t,�-19 Revision #2, attached. <br />At the request of. the owner to correct unforseen conditions. <br />$6,482.91 <br />The proposed changes In the wDrk may result in additional time <br />requTred.beyond the contract completion date. Additional time <br />added to the contract that Is directly related to this change <br />-The contractot will be paid for the additional required -jays <br />the rate of$300.00.(three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . $ 2,748,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . $ 254,638.70 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . S 3 , 002 , 638. 74 <br />The Contract Sum will be (increased) Xdwt Xo f9)Q)SW%3Sgeye}9 by this Change Order . . . $ 6,482.91 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 3,009,121.61 <br />The Contract Time will be (increased) (decreased) (unchange-!) by !- - -) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF EDDY <br />ARCHITECT <br />1320 Sn 131x1e NLqhw_ay <br />Address <br />BY C. <br />DATE ` ("�,lv <br />REINHOLD CONSTRUCTION INC. <br />CONTRACTOR <br />P,nl Rnx 665 <br />Address <br />Cocoa, FL 32922 <br />BY - <br />DATE <br />INDIAN RIVER COUNTY <br />Ow ER <br />2N5 14th Ave <br />Address <br />Vero -Beach, Fl. 32960 <br />E 6- /7 <br />AIA DOCUMENT GM • CHANCE ORDER • APRIL 1970 EDITION • AIA$ • C 19" . THE ONE PACE <br />AMERICAN INSTITUTE Of ARCHITECTS. 173S NEW YORK AVE., NW, WASHINGTON. D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.