My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (07)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (07)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 4:36:01 PM
Creation date
10/5/2015 10:01:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (7)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030Comprehensive Plan
Chapter 6 Capital Improvements Element
Supplemental fields
SmeadsoftID
13459
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />• 250 gallons per day per equivalent residential unit <br />Public Buildings (Countywide) <br />• 1.99 building square feet per capita for permanent plus weighted peak seasonal population <br />➢ Parks/Recreation (Unincorporated County) <br />• 6.61 acres per 1,000 permanent plus weighted peak seasonal population <br />➢ Sanitary Sewer (County Service Area) <br />• 250 gallons per day per equivalent residential unit <br />➢ Schools (School Service Area): <br />• 100 percent of Florida Inventory of School Houses (FISH) capacity for each public school <br />type (elementary, middle, and high). <br />➢ Solid Waste (Countywide) <br />2.2 tons per capita per year or 3.67 cubic yards per capita for permanent plus weighted <br />peak seasonal population per year <br />➢ Stormwater Management <br />• New drainage systems shall mitigate the impacts of a 25 year/24 hour design rainfall <br />event <br />• Minimum road crown elevation for existing roads shall be raised during <br />resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm <br />event on local roads <br />• The center two lanes of rebuilt roads must be at or above flood levels resulting from a <br />10 year/24 hour storm event on Arterial and Collector roads <br />• All drainage basins will meet the following level -of -service standards: <br />• By 2000 - 2 year/24 hour storm event <br />By 2005 - 5 year/24 hour storm event <br />By 2010 - 10 year/24 hour storm event <br />➢ Transportation (Roadways) <br />Level -of -Service "D" during peak hour, peak season, and peak direction conditions on <br />all TRIP grant funded roads as well as all freeway, arterial, and collector roadways, <br />with the exception of the following two, which will operate at level of service "E" <br />plus 20%: <br />• 27th Ave — South County Line to SR 60 <br />• 43rd Ave - Oslo Road to 16th Street <br />Community Development Department <br />Adopted November 2, 2010, Ordinance 2010-024 <br />Indian River County <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.