My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (07)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (07)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 4:36:01 PM
Creation date
10/5/2015 10:01:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (7)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030Comprehensive Plan
Chapter 6 Capital Improvements Element
Supplemental fields
SmeadsoftID
13459
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />Evaluation Matrix and monitoring procedures, which are currently being used to prepare the current <br />Evaluation and Appraisal Report and will be used to prepare future Evaluation and Appraisal Reports. <br />In addition, a great portion of the plan monitoring will be in conjunction with the concurrency <br />management system which is designed to ensure that approved level -of -service standards are <br />maintained and that sufficient capacity exists in the various services and facilities. Other evaluation <br />of the plan or plan elements is likely to occur in the day to day application of the mandated <br />regulations, which will result in plan amendments. <br />The formal Evaluation and Appraisal Report required by law is currently providing and in subsequent <br />versions will provide a complete review of the plan and be conducted in compliance with the public <br />participation procedures adopted for the development of this plan. <br />As part of the monitoring system, all appropriate baseline data is currently being updated and will be <br />updated. Besides assessing progress, the evaluation and appraisal process is and will also be used to <br />determine whether the objectives should be modified or expanded. In this way the monitoring and <br />evaluation of the Comprehensive Plan Elements not only provides a means of determining the degree <br />of success of the plan's implementation; it also provides a mechanism for evaluating needed changes <br />to the plan element. <br />Community Development Department Indian River County 65 <br />Adopted November 2, 2010, Ordinance 2010-024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.