Laserfiche WebLink
Comprehensive Plan Sanitary Sewer Sub -Element <br />pipes. In the future, the county's policy should be to continue to install automatic air release <br />valves in all new lines. <br />Service to New Development <br />Through the Utilities Department Wastewater Master Plan, the county has identified main lines <br />that must be installed along major corridors. Unlike other collection lines, "Master Plan" lines <br />usually do not connect directly to a wastewater generator. While master plan lines are paid for <br />by the Utilities Department with revenue from capacity charges and other sources, non -master <br />plan lines are paid from other sources. <br />Besides capital improvements programming and the assessment process, another way to expand <br />the collection system is through the platting and site plan approval requirements of new <br />development. For example, current comprehensive plan policies and land development <br />regulations mandate that each new subdivision within the Urban Service Area connect to the <br />centralized wastewater service system, if the proposed subdivision meets either of the following <br />criteria. <br />• It is within one-quarter of a mile of existing wastewater lines; or <br />• It contains 25 or more lots. <br />For non-residential projects, only those located more than 1/4 mile from the existing system and <br />generating less than 2000 gallons per day are not required to connect to the regional system. <br />Even non-residential projects meeting those requirements must connect if the system expands to <br />within 1/4 mile of the project. <br />Those requirements need to be maintained to ensure that expansion of the regional sanitary sewer <br />system occurs and to ensure that the costs of that expansion are paid by the beneficiaries of the <br />expansion. Even when a development project does not meet the above criteria, the project must <br />connect to the regional sanitary sewer system if the project is deemed unacceptable for septic <br />tank system use due to increased health and groundwater contamination risks. <br />There are several reasons for requiring nearly all new development to connect to the regional <br />system. Those reasons are listed below. <br />• Regional systems are less likely to fail. <br />• Regional systems are better regulated and inspected. <br />• Regional systems provide a higher level of treatment. That higher level of treatment <br />allows the effluent to be reused, rather than injected into the ground where the effluent <br />increases the risk of groundwater contamination. <br />Community Development Department Indian River County 26 <br />