My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (18)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 3:18:30 PM
Creation date
10/5/2015 10:00:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (18)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030 Comprehensive Plan
Chapter 3A Sanitary Sewer Sub-Element
Supplemental fields
SmeadsoftID
13450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />TREATMENT <br />Sanitary Sewer Sub -Element <br />In addition to septic tank systems, public and private treatment plants provide wastewater <br />treatment within the county. In Indian River County, large regional public treatment plants now <br />predominate. Consequently, major treatment issues in the county relate primarily to ensuring <br />sufficient capacity (either on-site or off-site) to accommodate projected growth. <br />If wastewater demand were allowed to exceed the county's treatment capacity, untreated sewage <br />would have to be discharged. That would result in health hazards and environmental degradation <br />of surface water bodies. To prevent such an occurrence, the county must continue its policy of <br />approving new development only when sufficient capacity will be available. In this regard, the <br />county's computerized concurrency management system and its capital improvements plan <br />ensure that capacity will be available to serve new development concurrent with demand. <br />Public Treatment Plants <br />Besides producing high quality effluent, all public treatment plants currently have more than <br />enough capacity to accommodate existing demand. The following sections discuss the county's <br />future wastewater treatment needs and alternatives to meet those needs. <br />Projection of Future Demand <br />Assumptions <br />The comprehensive planning process is an opportunity for the county to complete an assessment <br />of its long range sanitary sewer needs. Such a needs assessment must consist of an analysis that <br />is more than a straight line linear projection. Future projections should utilize certain <br />assumptions based on past trends, present conditions, and future desires. The main assumptions <br />utilized in the sanitary sewer needs assessment are as follows: <br />• The county will be the primary provider of sanitary sewer collection, treatment, and <br />disposal; <br />• The City of Vero Beach will continue to serve the City of Vero Beach, the Town of <br />Indian River Shores and a portion of the unincorporated county; and <br />• 90% to 95% of future new development will connect to the regional sewer system. <br />The county will continue to maintain these policies and evaluate the feasibility of regional <br />system versus package treatment plants for the above referenced type of developments. <br />Community Development Department Indian River County 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.