My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-252A (20)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-252A (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 3:20:10 PM
Creation date
10/5/2015 10:01:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
10/12/2010
Control Number
2010-252A (20)
Agenda Item Number
10.A.3
Entity Name
Comprehensive Plan
Subject
EAR based Amendments 2030 Comprehensive Plan
Chapter 3C Solid Waster Sub-Element
Supplemental fields
SmeadsoftID
13452
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />PLAN IMPLEMENTATION <br />Solid Waste Sub -Element <br />An important part of any plan is its implementation. Implementation involves execution of the <br />plan's policies. It involves taking actions and achieving results. <br />For the Solid Waste Sub -Element, implementation involves various activities. While some of these <br />actions will be ongoing, others are activities that will be taken by certain points in time. For each <br />policy in this element, Table 3.C.5 identifies the type of action required, the responsible entity for <br />taking the action, the timing, and whether or not the policy necessitates a capital expenditure. <br />To implement the Solid Waste Sub -Element, several different types of actions must be taken. These <br />include: construction of additional landfill segments, acquisition of new equipment, improvement or <br />replacement of existing equipment, adoption of land development regulations and ordinances, <br />coordination, and preparation of studies and evaluation and monitoring reports. <br />Overall plan implementation responsibility will rest with the Solid Waste Disposal District. Besides <br />responsibilities identified in Table 3.C.5, the Planning Department has the additional responsibility <br />of ensuring that other entities discharge their responsibilities. This will entail notifying other <br />applicable departments of capital expenditures to be included in their budgets, notifying other <br />departments and groups of actions that must be taken, and assisting other departments and agencies <br />in their plan implementation responsibilities. <br />TABLE 3.C.5 <br />SOLID WASTE SUB -ELEMENT <br />IMPLEMENTATION MATRIX <br />POLICY # <br />TYPE OF ACTION <br />RESPONSIBILITY <br />TIMING <br />CAPITAL EXPENDITURE <br />1.1 <br />Design & Construction <br />Solid Waste Disposal District <br />Ongoing <br />Yes <br />1.2 <br />Permitting and Concurrency <br />BCC/Solid Waste D.D./PS <br />Ongoing <br />Yes <br />1.3 <br />Level of Service standard <br />BCC/SWDD/PS <br />Ongoing <br />No <br />1.4 <br />Monitoring Procedure <br />Planning Staff <br />Ongoing <br />No <br />1.5 <br />Annual Report <br />SWDD <br />Annually <br />No <br />1.6 <br />Capacity Provision <br />SWDD <br />Ongoing <br />Yes <br />1.7 <br />Coordination <br />BCC/Municipalities <br />Ongoing <br />No <br />2.1 <br />Sludge Disposal <br />SWDD/Utilities Dept. <br />Ongoing <br />Yes <br />2.2 <br />Screenings & Grit Disposal <br />SWDD/Utilities Dept. <br />Ongoing <br />Yes <br />2.3 <br />Septage Disposal <br />SWDD/Utilities Dept. <br />Ongoing <br />Yes <br />2.4 <br />Collection of household hazardous waste <br />SWDD <br />Ongoing <br />Yes <br />2.5 <br />Hazardous Waste Transport <br />SWDD <br />Ongoing <br />No <br />2.6 <br />Water Quality Monitoring <br />SWDD <br />Ongoing <br />No <br />2.7 <br />Maintaining the existing Procedures <br />SWDD <br />Ongoing <br />No <br />Community Development Department Indian River County 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.