My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-044
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:04:00 PM
Creation date
10/5/2015 9:01:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
02/09/2010
Control Number
2010-044
Agenda Item Number
12.A.1.
Entity Name
Indian River County 2010 EECBG Energy Efficiency Project
Subject
FPL Energy Audit
Supplemental fields
SmeadsoftID
8607
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY PHASE 2 <br /> Y TECHNICAL ENERGY AUDIT <br /> RECOMMENDED ENERGY CONSERVATION MEASURES <br /> FPLES recommends that Indian River County moves forward to implement the lighting <br /> retrofit, as the ECM has the following savings and cost characteristics: <br /> e <br /> N/A $411532 12,886 7 107 430 229 8.4 Yrs <br /> (Note: The detailed analyses and cut sheets for this ECM can be found in Appendix H& I) <br /> ECM - 2: Occupancy Sensors <br /> FPLES performed an analysis of the facility's lighting system with respect to the <br /> use of occupancy sensors. It showed that additional savings for the selected <br /> rooms can be achieved adding the sensors. This is based on a review of the <br /> facility's occupancy pattern, lighting usage and FPLES historical data. <br /> For this facility, multiple rooms were selected for the installation of occupancy <br /> sensors and/or time switches which resulted in additional 3,384 kWh in savings. <br /> The models being used are shown in the Appendix and are for the various rooms <br /> (offices, conference rooms, storage rooms, mechanical rooms and electrical <br /> rooms). <br /> FPLES recommends that Indian River County moves forward to implement the occupancy sensors, <br /> as the overall"project"economics justifies the installation of such a system: <br /> Room ended_ <br /> NLA 380 4625 12.2 Yrs <br /> (Note: The detailed analyses and cut sheets for this ECM can be found in Appendix H& I) <br /> ECM - 3: Water Conservation <br /> FPLES performed a walkdown of the facility's domestic water system with respect to <br /> installing low flow and ultra low flow fixtures. As a result, it was determined that savings <br /> can be achieved through the replacement and/or retrofit of water fixtures. The analysis included <br /> determining the consumption of the existing (pre) fixtures, comparing it to the baseline water bill (see <br /> Modeling Methods, Section 3) and determining the consumption of the retrofit (post) fixtures. Once <br /> the post and pre consumption were determined, the savings were calculated based on the current <br />
The URL can be used to link to this page
Your browser does not support the video tag.