My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-044
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:04:00 PM
Creation date
10/5/2015 9:01:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
02/09/2010
Control Number
2010-044
Agenda Item Number
12.A.1.
Entity Name
Indian River County 2010 EECBG Energy Efficiency Project
Subject
FPL Energy Audit
Supplemental fields
SmeadsoftID
8607
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY PHASE 2 <br /> TECHNICAL ENERGY AUDIT <br /> RECOMMENDED ENERGY CONSERVATION MEASURES <br /> Therefore, FPLES does not recommend that Indian River County move forward to implement a solar <br /> hot water system at this facility. The detailed analyses and cut sheets for this ECM can be found in <br /> Appendix D &N. <br /> ECM - 6: Conversion to Natural Gas <br /> FPLES evaluated the potential energy savings associated with replacing the existing propane tanks <br /> and replacing them with piped Natural Gas from the main gasline located near US1. The scope would <br /> include: <br /> • New natural gas line from US-1 to IRC County Jail. <br /> • New natural gas meters at IRC County Jail, two total. <br /> • Natural Gas piping from new meters to existing propane piping. <br /> • Removal of existing propane tanks. <br /> • Conversion of propane equipment to natural gas, seven boilers and various kitchen and <br /> dryers. <br /> • Pressuring reducing valves at all gas burning equipment. <br /> Exclusions: <br /> • Temporary gas service during piping switchover. <br /> • Painting <br /> FPLES recommends that Indian River County moves forward to implement the gas conversion, as <br /> the overall "project"economics justifies the installation of such a system: <br /> Recomme <br /> N/A $13,995 $254,270 18.2 Yrs <br /> (Note: The detailed analyses and cut sheets for this ECM can be found in Appendix J& K) <br /> County Jail Summary <br /> $49,019 $2,886 to $689.194 13.3 Yrs <br /> (Note: the overall"project"economics justifies the inclusion of this facility) <br /> F <br /> Proprietary and Confidential FPL Eneigy Set vices, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.