Laserfiche WebLink
INDIAN RIVER COUNTY PHASE 2 <br /> TECHNICAL ENERGY AUDIT <br /> RECOMMENDED ENERGY CONSERVATION MEASURES <br /> found to be applicable and advantageous for the facility. The identified high water consumption <br /> faucets, water closets, and urinals should be replaced at this facility. The field investigation identified <br /> 104 restroom fixtures at the facility. After completion of the analysis,55 replacement fixtures were <br /> proposed in the water conservation project shown below: <br /> Health Department Proposed Water Conservation Fixtures <br /> 4"Single Metered Faucet Dual Temp 0.5 GPM 2 <br /> 8"Dual Lever Faucet Gooseneck 0.5 GPM 24 <br /> 8"Sin le Lever Lounge Faucet with 0.5 gpm aerator 0.5 GPM 2 <br /> Floor Mount Dual Flush Water Closet-Tank 1.6/0.8 1.0 GPF 9 <br /> Floor Mount Dual Flush Water Closet ADA-Tank 1.6/0.8 1.0 GPF 7 <br /> Floor Mount To Sud Floor Outlet Water Closet-FV 1.28 GPF 2 <br /> Floor Mount Top Sud Floor outlet Water Closet ADA-FV 1.28 GPF 6 <br /> Wali Hung Top Sud Urinal—FV 0.125 GPF 3 <br /> Exclusions contain the following: <br /> • Existing low consumption faucets or faucets used for medical purposes <br /> • Existing low consumption showerheads <br /> Health Department water conservation has savings at$1,645, with a cost of$56,570, and a payback <br /> of greater than 34 Yrs. Therefore, FPLES does not recommends that Indian River County moves <br /> forward to implement the water conservation retrofit. The detailed analyses and cut sheets <br /> for this ECM can be found in Appendix 7& K. <br /> ECM — 4: HVAC <br /> FPLES evaluated the potential savings of replacing the existing 96-ton air cooled chiller at the <br /> Health Department with a new high efficiency 96-ton air cooled chiller with variable flow primary <br /> pumping. <br /> • New 96 ton air cooled chiller, 1.15 l ton <br /> • New 10 HP, high of l Dee <br /> riabie speed pump with drive. New Variable Speed Drive <br /> to be located in AH • I room adjacent to Chiller yard. <br /> • New pot feeder, r snd expansion tank. <br /> • New chiller con bl paller and variable pump control. New Dp to be provided <br /> to control pum P cated in adjacent AHU Mechanical Room. <br /> • Conversion of 5 existing 3-way chilled water valve to 2-way chilled water valves <br /> • Commissioning of new chiller and pump. <br /> • Insulation of pump and new piping. <br />