Laserfiche WebLink
INDIAN RIVER COUNTY PHASE 2 <br /> TECHNICAL ENERGY AUDIT <br /> RECOMMENDED ENERGY CONSERVATION MEASURES <br /> Proposed Water Conservation Fixtures <br /> 4"Single etered Faucet Dual Temp 0.5 GPM 4' <br /> Floor Mount Top Spud Floor Outlet Water Closet ADA—FV 1.28 GPF 4 <br /> Water conservation has an annual savings at$49, with a cost of$7,705, and a payback of greater <br /> than 100Yrs. Therefore, FPLES does not recommends that Indian River County moves forward to <br /> implement the water conservation retrofit. The detailed analyses and cut sheets for this <br /> ECM can be found in Appendix J & K. <br /> Traffic Office and Garage Summary <br /> $1,846 118 0 $12,594 6.4 Yrs <br /> Road and Bridge <br /> HVAC Controls - Road and Bridge <br /> FPLES evaluated the potential energy savings associated with replacing the existing stand-alone <br /> control system. This system is responsible for automating the cooling equipment for the Road and the <br /> Bridge offices. The equipment controlled by this system includes air handling units AHU�-IA,AHU- <br /> 2A;and AHU-1B. <br /> • New control panels utilizing existing dampers and sensors in space. <br /> • New control sequence to setback temperature and reduce outside air during unoccupied times. <br /> Exclusion <br /> • Connection to County LAN <br /> • Replacement of AHU or CU <br /> • Painting <br /> • Test and Balance <br /> • Temporary Cooling <br /> FPLES recommends that Indian River County moves forward to implement the Road and Bridge <br /> AHU Controls, as the ECM has the following savings and cost characteristics: <br />