Laserfiche WebLink
' EXHIBIT G - INDIAN RIVER COUNTY PHASE 2 <br /> TECHNICAL ENERGY AUDIT <br /> BY FPL ENERGY SERVICES., INC. <br /> NOVEMBER 2009 <br /> Table 3 - Hot Water Heater/Solar Profile/Ener- <br /> Hot Water Profile <br /> Hour of Day Average Weekday <br /> ProductionMBTUs Gals kW Gals <br /> Period <br /> 0:00 84.37 85.16 87.93 88.76 N <br /> 1:00 75.67 76.38 86.41 87.22 N <br /> 2:00 73.20 73.89 79.05 79.79 N <br /> 3:00 71.75 72.4377.88 78.61 N <br /> 4:00 76.64 77.36 80.46 81.21 N <br /> 5:00 85.55 86.35 80.49 81.25 N <br /> 6:00 97.25 98.13 85.46 86.23 N <br /> 7:00 138.08 139.41109.08 110.13 N <br /> 8:00 157.59 159.07 107.01 - 108.01 Y <br /> 9:00 251.30 253.66 159.43 160.92 Y <br /> 10:00 291.43 365.27 276.16 346.13 Y <br /> 11:00 305.68 332.30 254.78 276.96 Y` <br /> 12:00 239.57 241.82 177.90 '. 179,57 Y <br /> 13:00 180.63 182.32 132.36 133.60 Y <br /> 1450 191.59 193.39 173.79 175.42 Y <br /> 15:00 291.06 293.79 177.73 179.39 Y <br /> 16:00 170.34 171.94 108.72 109.74 Y <br /> 17:00 102.63 103.59 84.52 85.31' Y <br /> 18:00 115.93- 117:02 119.58 120.70 Y <br /> 19:00 276.03 307.91 299.26 333.83 N <br /> 20:00 306.17 342.58 254.05 284.26 N <br /> 21:00 247.30 249.62 184.26 185.99 N <br /> 22:00 251.71 254.07 209.54 211.50 N <br /> 23:00 117.27 118.34 118.08 119.16 N <br /> Sub -Total (Gals and <br /> MBTU during solar 2297.76 2414.17 1771.97 1875.76 N/A <br /> heating) <br /> Sub -Total (Gals and <br /> MBTU w/o solar 1901.00 1981.63 1751.96 1827.94 N/A <br /> heatin <br /> Total (Gals and 4198.76 4395.80 <br /> i <br /> The existing water heater/boiler energy use was calculated by converting the daily <br /> usage profile to monthly, then applying the energy rate ($/therm). <br /> Table 4- Existina Boiler Ene Cost <br /> Month Days per MonthEnergy (MBTU) Natural <br /> Proprietary& Confidential 3 Modeling <br /> FPL, <br />