My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
7/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:16:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:p: :i: :iC::�T:Nli�:i: •1j. <br />IR <br />CHANGE ARC61T g <br />ARCF(TI CT <br />ORDER CONTRACTOR <br />FIELD ❑ <br />AAA DOCL/RlENT G701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUNIMR: 55 <br />(name. address) County Administration Bldg. <br />TO (Contractor) <br />ARCHITECT'S PROTECT NO: 963 <br />Reinhold Construction Inc. CONTRACT FOR Additions and Renovations <br />P.O.Box 666 <br />Cocoa, FL 32922 <br />L CONTRACT DATE: 4/2/80 <br />You are directed to make the following changes in this Contract <br />Additional work (CO -20) for ceiling soffits -S106 $245.63 <br />CP -102 Provide power to condenser water pump (P-6),new location. $653.67 <br />CP -104 Provide existing door to fit (210'') opening at entry lobby,(door $523.12 <br />from existing storage materials) and necessary hardware. <br />CP -106 Provide a starter 3/4HP motor for existing AHU #4 located $709.98 <br />in the second floor equipment room in the east wing south, <br />Replace smoke detec-tor. <br />Total $T,-13240 <br />The above requested by the owner to resolve problems in the <br />field that were unforeseen. <br />The proposed changes in the work may result in additional time <br />required beyond the contract completion date. Additional time <br />wlll be added to the contract that is directly related to this change <br />order. The contractot will be paid for the additional required days <br />at the rate ofS300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 2 , 748 , 000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . $ 314,078.00 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . S 3,o62,078-00 <br />The Contract Sum will be (increased)74ie'�(a4` X?diX'�(+16Xt14 by this Change Order S 2,132.40 <br />The new Contract Sum including this Change Order will be $ 3.064,210.40 <br />The Contract Time will be (Increased) (decreased) (unchanged) by <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL <br />METCALF & EDDY <br />REINHOLD CONSTRUCTION INC, <br />INDIAN RIVER COUNTY <br />lWylEo, <br />Dixie Highway <br />CQQN77.O,Boxfix %66 _ <br />P <br />°}1v � 14th Ave <br />Address <br />Coral Gables, FL 33134 <br />Address <br />Cocoa, F1 32922 <br />Address , <br />Vero Beach, -FL <br />/ <br />_32960 <br />ey_"��"f <br />Z.X-:p Ir -1 <br />BY <br />/J <br />v <br />DATE <br />DATE <br />DATE <br />AIA DOCUMENT G701 - CHANGE ORDER - APRIL 1970 EDITION - Arne?±: - 0 1970 • THE ONE PACE <br />AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW YORK AVE., NW. WASHINGTON, D.C. 20)06 <br />8009 PACE <br />71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.