My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />3.1 EXAMINATION <br />A. Verify, with steel Erector present, elevations of concrete- and masonry -bearing surfaces and <br />locations of anchor rods, bearing plates, and other embedments for compliance with <br />requirements. <br />1. Prepare a certified survey of bearing surfaces, anchor rods, bearing plates, and other <br />embedments showing dimensions, locations, angles, and elevations. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Provide temporary shores, guys, braces, and other supports during erection to keep structural <br />steel secure, plumb, and in alignment against temporary construction loads and loads equal in <br />intensity to design loads. Remove temporary supports when permanent structural steel, <br />connections, and bracing are in place unless otherwise indicated. <br />1. Do not remove temporary shoring supporting composite deck construction until cast -in- <br />place concrete has attained its design compressive strength. <br />3.3 ERECTION <br />A. Set structural steel accurately in locations and to elevations indicated and according to <br />AISC 303 and AISC 360. <br />Base Bearing and Leveling Plates: Clean concrete- and masonry -bearing surfaces of bond - <br />reducing materials, and roughen surfaces prior to setting plates. Clean bottom surface of <br />plates. <br />1. Set plates for structural members on wedges, shims, or setting nuts as required. <br />2. Weld plate washers to top of baseplate. <br />C. Maintain erection tolerances of structural steel within AISC's "Code of Standard Practice for <br />Steel Buildings and Bridges." <br />Align and adjust various members that form part of complete frame or structure before <br />permanently fastening. Before assembly, clean bearing surfaces and other surfaces that will be <br />in permanent contact with members. Perform necessary adjustments to compensate for <br />discrepancies in elevations and alignment. <br />Level and plumb individual members of structure. <br />Make allowances for difference between temperature at time of erection and mean <br />temperature when structure is completed and in service. <br />E. Splice members only where indicated. <br />F. Do not enlarge unfair holes in members by burning or using drift pins. Ream holes that must be <br />enlarged to admit bolts. <br />G. Shear Connectors: Prepare steel surfaces as recommended by manufacturer of shear <br />connectors. Use automatic end welding of headed -stud shear connectors according to <br />AWS D1.1/D1.1M and manufacturer's written instructions. <br />STRUCTURAL STEEL FRAMING 051200-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.