My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />D. Critical Path: The longest connected chain of interdependent activities through the network <br />schedule that establishes the minimum overall Project duration and contains no float. <br />E. Event: The starting or ending point of an activity. <br />F. Float: The measure of leeway in starting and completing an activity. <br />1. Float time belongs to Owner. <br />2. Free float is the amount of time an activity can be delayed without adversely affecting the <br />early start of the successor activity. <br />3. Total float is the measure of leeway in starting or completing an activity without <br />adversely affecting the planned Project completion date. <br />G. Resource Loading: The allocation of manpower and equipment necessary for the completion of <br />an activity as scheduled. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Format for Submittals: Submit required submittals in the following format: <br />1. Working electronic copy of schedule file, where indicated. <br />2. PDF electronic file. <br />3. Three (3) paper copies unless otherwise required by the Owner. <br />B. Startup construction schedule. <br />1. Approval of cost -loaded, startup construction schedule will not constitute approval of <br />schedule of values for cost -loaded activities. <br />C. Startup Network Diagram: Of size required to display entire network for entire construction <br />period. Show logic ties for activities. <br />D. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule <br />for entire construction period. <br />1. Submit a working electronic copy of schedule, using software indicated, and labeled to <br />comply with requirements for submittals. Include type of schedule (Initial or updated) <br />and date on label. <br />E. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format <br />for each activity in reports shall contain activity number, activity description, cost and resource <br />loading, original duration, remaining duration, early start date, early finish date, late start date, <br />late finish date, and total float in calendar days. <br />1. Activity Report: List of all activities sorted by activity number and then early start date, <br />or actual start date if known. <br />2. Logic Report: List of preceding and succeeding activities for all activities, sorted in <br />ascending order by activity number and then early start date, or actual start date if known. <br />3. Total Float Report: List of all activities sorted in ascending order of total float. <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.