Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality - <br />control services required by the Contract Documents as a component of Contractor's quality - <br />control plan. Coordinate and submit concurrently with Contractor's construction schedule. <br />Update as the Work progresses. <br />1. Distribution: Distribute schedule to Owner, Architect, testing agencies, and each party <br />involved in performance of portions of the Work where tests and inspections are required. <br />1.11 SPECIAL TESTS AND INSPECTIONS <br />A. Special Tests and Inspections: Engage a qualified testing agency to conduct special tests and <br />inspections required by authorities having jurisdiction as the responsibility of Owner. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 TEST AND INSPECTION LOG <br />A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br />B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test <br />and inspection log for Architect's reference during normal working hours. <br />3.2 REPAIR AND PROTECTION <br />A. General: On completion of testing, inspecting, sample taking, and similar services, repair <br />damaged construction and restore substrates and finishes. <br />1. Provide materials and comply with installation requirements specified in other <br />Specification Sections or matching existing substrates and finishes. Restore patched <br />areas and extend restoration into adjoining areas with durable seams that are as invisible <br />as possible. Comply with the Contract Document requirements for cutting and patching <br />in Section 01700 "Execution Requirements." <br />B. Protect construction exposed by or for quality -control service activities. <br />C. Repair and protection are Contractor's responsibility, regardless of the assignment of <br />responsibility for quality -control services. <br />END OF SECTION 01 40 00 <br />QUALITY REQUIREMENTS 01 40 00 - 9 <br />