My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />SECTION 01 7 7 00 - CLOSEOUT PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for contract closeout, including, <br />but not limited to, the following: <br />1. Substantial Completion procedures. <br />2. Final completion procedures. <br />3. Warranties. <br />4. Final cleaning. <br />5. Repair of the Work. <br />B. Related Requirements: <br />1. Section 01 78 10 "Project Record Documents" for submitting record Drawings, record <br />Specifications, and record Product Data. <br />1.3 ACTION SUBMITTALS <br />A. Product Data: For cleaning agents. <br />B. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion. <br />C. Certified List of Incomplete Items: Final submittal at Final Completion. <br />1.4 CLOSEOUT SUBMITTALS <br />A. Certificates of Release: From authorities having jurisdiction. <br />B. Certificate of Insurance: For continuing coverage. <br />C. Field Report: For pest control inspection. <br />1.5 MAINTENANCE MATERIAL SUBMITTALS <br />A. Schedule of Maintenance Material Items: For maintenance material submittal items specified in <br />other Sections. <br />CLOSEOUT PROCEDURES 01 77 00 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.