My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />a. Project name. <br />b. Date. <br />c. Name of Architect. <br />d. Name of Contractor. <br />e. Page number. <br />4. Submit list of incomplete items in the following format: <br />a. MS Excel electronic file. Architect will return annotated file. <br />b. PDF electronic file. Architect will return annotated file. <br />c. Three paper copies. Architect will return two copies. <br />1.9 SUBMITTAL OF PROJECT WARRANTIES <br />A. Time of Submittal: Submit written warranties on request of Architect for designated portions of <br />the Work where commencement of warranties other than date of Substantial Completion is <br />indicated, or when delay in submittal of warranties might limit Owner's rights under warranty. <br />B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of <br />designated portions of the Work that are completed and occupied or used by Owner during <br />construction period by separate agreement with Contractor. <br />C. Organize warranty documents into an orderly sequence based on the table of contents of Project <br />Manual. <br />1. Bind warranties and bonds in heavy-duty, three-ring, vinyl -covered, loose-leaf binders, <br />thickness as necessary to accommodate contents, and sized to receive 8 -1/2 -by -11 -inch <br />(215 -by -280 -mm) paper. <br />2. Provide heavy paper dividers with plastic -covered tabs for each separate warranty. Mark <br />tab to identify the product or installation. Provide a typed description of the product or <br />installation, including the name of the product and the name, address, and telephone <br />number of Installer. <br />3. Identify each binder on the front and spine with the typed or printed title <br />"WARRANTIES," Project name, and name of Contractor. <br />4. Warranty Electronic File: Scan warranties and bonds and assemble complete warranty <br />and bond submittal package into a single indexed electronic PDF file with links enabling <br />navigation to each item. Provide bookmarked table of contents at beginning of <br />document. <br />D. Provide additional copies of each warranty to include in operation and maintenance manuals. <br />PART 2- PRODUCTS <br />2.1 MATERIALS <br />A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or <br />fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially <br />hazardous to health or property or that might damage finished surfaces. <br />CLOSEOUT PROCEDURES 01 77 00 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.