My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />3.1 EXAMINATION <br />A. Do not proceed with installation until all wet work such as concrete, terrazzo, plastering and <br />painting has been completed and thoroughly dried out. <br />3.2 PREPARATION <br />A. Measure each ceiling area and establish layout of acoustical units to balance border widths at <br />opposite edges of each ceiling. Avoid use of less than half width units at borders, and comply <br />with reflected ceiling plans. Coordinate panel layout with mechanical and electrical fixtures. <br />3.3 INSTALLATION <br />A. Install suspension system and panels in compliance with ASTM C636, with the authorities hav- <br />ing jurisdiction, and in accordance with the manufacturer's installation instructions: <br />1. MetalWorks Tegular Installation Instructions, LA 295519 <br />2. MetalWorks Cutting Instructions, LA 295518 <br />B. Suspend main beam from overhead construction with hanger wires spaced 4 feet on center <br />along the length of the main runner. Install hanger wires plumb and straight. Hanger wires shall <br />not be installed in convenience holes. <br />C. Install wall moldings at intersection of suspended ceiling and vertical surfaces. Miter corners <br />where wall moldings intersect or install corner caps. <br />D. Follow the instructions found in "MetalWorks Tegular Installation Instructions", LA -295519 <br />for border treatment of the MetalWorks Tegular panels. The face of the suspension system rests <br />directly on the molding or trim flange. <br />3.4 ADJUSTING AND CLEANING <br />A. Replace damaged and broken panels. <br />B. Clean exposed surfaces of ceilings panels, including trim, edge moldings, and suspension <br />members. Comply with manufacturer's instructions for cleaning and touch up of minor finish <br />damage. Remove and replace work that cannot be successfully cleaned and repaired to perma- <br />nently eliminate evidence of damage <br />END OF SECTION 09545 <br />ACOUSTICAL METAL PAN CEILINGS 09545-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.