Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />F. Light -Leakage Test: Illuminate one side of partition installation and observe vertical joints and <br />top and bottom seals for voids. Adjust partitions for alignment and full closure of vertical joints <br />and full closure along top and bottom seals. <br />3.3 ADJUSTING <br />A. Adjust operable glass -panel partitions, hardware, and other moving parts to function smoothly, <br />and lubricate as recommended by manufacturer. <br />B. Adjust [pass doors] [and] [storage pocket doors] to operate smoothly and easily, without <br />binding or warping. <br />C. Verify that safety devices are properly functioning. <br />3.4 MAINTENANCE SERVICE <br />A. Maintenance Service: Beginning at Substantial Completion, maintenance service shall include <br />12 months' full maintenance by manufacturer's authorized service representative. Include <br />quarterly preventive maintenance, repair or replacement of worn or defective components, <br />lubrication, cleaning, and adjusting as required for proper operable -partition operation. Parts <br />and supplies shall be manufacturer's authorized replacement parts and supplies. <br />3.5 DEMONSTRATION <br />A. Engage a factory -authorized service representative to train Owner's maintenance personnel to <br />adjust, operate, and maintain operable glass -panel partitions. <br />END OF SECTION 102239.13 <br />FOLDING GLASS -PANEL PARTITIONS 102239.13 - 7 <br />