Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />K. Baked -Enamel or Powder -Coat Finish: AAMA 2603 except with a minimum dry film thickness <br />of 1.5 mils (0.04 mm). Comply with coating manufacturer's written instructions for cleaning, <br />conversion coating, and applying and baking finish. <br />1. Color and Gloss: As selected by Architect from manufacturer's full range . <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates, areas, and conditions, with Installer present, for compliance with <br />requirements for installation tolerances, including concrete bases; accurate placement, pattern, <br />and orientation of anchor bolts; critical dimensions; and other conditions affecting performance <br />of the Work. <br />B. Examine roughing -in for electrical system to verify actual locations of connections before <br />shelter installation. <br />C. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of <br />the Work. <br />D. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION <br />A. Install shelters according to manufacturer's written instructions. <br />B. Set shelters plumb and aligned with full bearing on concrete bases. <br />C. Fasten shelters securely to concrete base with anchorage indicated. <br />D. Connect to electrical power. <br />3.3 ADJUSTING <br />A. After completing installation, inspect exposed finishes and repair damaged finishes. <br />END OF SECTION 107343 <br />TRANSPORTATION STOP SHELTERS 107343 - 4 <br />