My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />1. Material: Enameled steel. <br />2. Front Wheel: Applies tape to cover as you walk it along. <br />3. Handle: Adjusts to operator's height. <br />4. Tape Support: Drop-in place. <br />5. Tape Size: Accommodates 3 -inch wide tape. <br />D. Seaming Tape: "Covertape". <br />1. Temporarily covers overlap seams. <br />2. Transparent. <br />3. Easy to remove. <br />4. Leaves no messy glue residue behind. <br />5. Width: 3 inches. <br />6. Length per Roll: 36 yards. <br />E. Protective Gymnasium Floor Cover Cleaner: "Cleanmate". <br />1. Concentrated, anti -static cleaning solution. <br />2. Cleans and conditions protective gymnasium floor covers. <br />PART 3 EXECUTION <br />3.1 ASSEMBLY <br />A. Cover Handling System: <br />1. <br />2. Field assemble cover handling system by manufacturer -approved assembly service. <br />3. Ensure casters and rollers operate smoothly without binding. <br />B. Dual -Brush System: Mount dual -brush system on cover handling system in accordance with <br />manufacturer's instructions. <br />3.2 PROTECTION <br />A. Protect protective gymnasium floor covers and cover handling system from damage during construction. <br />B. Do not use protective gymnasium floor covers or cover handling system to protect gymnasium floors <br />during construction. <br />END OF SECTION <br />PROTECTIVE GYM FLOORCOVERS 11 66 23 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.