My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />2.9 ALUMINUM FINISHES <br />A. Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mmor thicker. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates and floor conditions for compliance with requirements for location, size, <br />minimum recess depth, and other conditions affecting installation of floor grilles and frames. <br />B. Examine roughing -in for drainage piping systems to verify actual locations of piping <br />connections before floor grille and frame and drain pan installation. <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION <br />A. Install recessed floor grilles and frames and drain pans to comply with manufacturer's written <br />instructions at locations indicated and with top of floor grilles and frames in relationship to one <br />another and to adjoining finished flooring as recommended by manufacturer. Set floor -grille <br />tops at height for most effective cleaning action. Coordinate top of floor -grille surfaces with <br />doors that swing across grilles to provide clearance under door. <br />3.3 PROTECTION <br />A. After completing frame installations, provide temporary filler of plywood or fiberboard in floor - <br />grille recesses and cover frames with plywood protective flooring. Maintain protection until <br />construction traffic has ended and Project is near Substantial Completion. <br />END OF SECTION 124816 <br />ENTRANCE FLOOR GRILLES 124816 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.