Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />d. Integrally molded recess pockets to accept seat number and row letters. <br />e. Integrally molded rear closure panel at back of seat to allow for "continuous clean sweep" of <br />debris at deck level and minimized visibility of structural ribbing. <br />f. Seat Attachment: Each polymer seat module shall be securely anchored by a 12 ga steel clamp <br />bracket that provides steel -to -steel, through bolted attachment to the front nose beam of the <br />bleacher. Attachment eliminates fore / aft movement of the seat module on the nose beam. <br />2.05 SHOP FINISHES <br />A. Understructure: For rust resistance, steel understructure shall be finished on all surfaces with black "Dura - <br />Coat" enamel. Understructure finish shall contain a silicone additive to improve scratch resistance of <br />finish. <br />B. Wear Surfaces: Surface subject to normal wear by spectators shall have a finish that does not wear to <br />show different color underneath: <br />1. Steel nosing and rear risers shall be pre -galvanized with a minimum spangle of G-60 zinc plating. <br />2. Decking shall have use -surfaces to receive both a sealer coat and wear -resistant high gloss clear <br />urethane finish. Optional decking to have 0.030" laminated polyethylene wear surface. <br />3. Injection Molded Courtside seats shall be per manufacturer standard 15 colors. <br />C. Railings: Steel railings shall be finished with powder -coated semi - gloss black or optional 15 standard <br />colors to match polymer seat color. <br />D. High Humidity finish: Above shop fmishes shall include following modifications: <br />1. Understructure: All frames and other structural components shall be hot -dip galvanized <br />per ASTM A103 <br />2. All top -side rails shall be e -coated prior to powder paint coating <br />3. All hardware to be zinc -plated <br />4. All posi-locks and other steel wear surfaces to be electroless-nickel plated <br />5. Decking to be polyethylene -laminated plywood <br />2.06 FASTENINGS <br />A. Welds: Performed by welders certified by AWS standards for the process employed. <br />B. Structural Connections: Secured by structural bolts with prevailing torque lock nuts, free -spinning nuts in <br />combination with lock washers, or Riv-nuts in combination with lock washers. <br />2.07 ELECTRICAL OPERATION <br />A. Integral Power <br />1. Default operation shall be with a removable pendant control unit which plugs into seating bank for <br />tethered operator management of stop, start, forward, and reverse control of the power operation. <br />Other modes of operation are optional. <br />2. PF1/2/3/4: Furnish and install Hussey PF(1/2/3/4), an integral automatic electro mechanical powered <br />frame propulsion system, to open and close telescopic seating. <br />TELESCOPIC BLEACHERS 12 66 13 - 10 <br />