My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />B. Adhesive: (select one) Roppe 205 Wall Base Adhesive or 210 White Acrylic Wall Base Adhe- <br />sive <br />C. Caulking: Roppe Colored Caulk <br />3.02 EXAMINATION <br />Site Verification of Conditions: Verify substrate conditions are acceptable for installing product <br />in accordance with manufacturer's instructions. <br />B. Material Inspection: In accordance with manufacturer's installing requirements, visually inspect <br />materials prior to installing. Material with visual defects shall not be installed. <br />3.03 PREPARATION <br />A. Adjacent Surfaces Protection: Protect adjacent work areas and finish surfaces from damage <br />during product installation. <br />B. Surface Preparation, General: Prepare substrate in accordance with manufacturer's instructions. <br />C. Substrate: Prepare manufacturer's recommended substrates to be smooth, rigid, flat, lev el, <br />permanently dry, clean and free of foreign materials such as paint, dust, grease, oils, solvent, <br />old adhesive residue, vinyl wall coverings, non -porous surfaces and all other contaminants that <br />may interfere with adhesive bond. <br />3.04 INSTALLING <br />A. Manufacturer's instructions for specifications on installing resilient wall base. <br />B. Resilient wall base colors, heights and profiles: As selected by Architect. <br />C. Roppe Adhesive <br />D. Roppe Colored Caulk <br />3.05 FIELD QUALITY REQUIREMENT <br />A. Manufacturer's Field Services: Upon Owner's request and with minimum 72 hours notice, pro- <br />vide manufacturer's field service consisting of product use recommendations and periodic site <br />visits to confirm installing of product is in accordance with manufacturer's instructions. <br />1. Site Visits On site visit shall occur on the first day of resilient wall base installation. <br />RESILIENT WALL BASE 096500-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.