My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />I. Steel -Piping, Roll -Grooved Joints: Roll rounded -edge groove in end of pipe according to <br />AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe <br />and grooved -end fittings according to AWWA C606 for steel -pipe grooved joints. <br />J. Dissimilar -Material Piping Joints: Make joints using adapters compatible with materials of both <br />piping systems. <br />3.5 VALVE AND SPECIALTIES INSTALLATION <br />A. Install listed fire -protection valves, trim and drain valves, specialty valves and trim, controls, and <br />specialties according to NFPA 13 and authorities having jurisdiction. <br />B. Install listed fire -protection shutoff valves supervised open, located to control sources of water <br />supply except from fire -department connections. Install permanent identification signs <br />indicating portion of system controlled by each valve. <br />C. Install check valve in each water -supply connection. Install backflow preventers instead of <br />check valves in potable -water -supply sources. <br />D. Specialty Valves: <br />1. General Requirements: Install in vertical position for proper direction of flow, in main <br />supply to system. <br />2. Alarm Valves: Include bypass check valve and retarding chamber drain -line connection. <br />3.6 SPRINKLER INSTALLATION <br />A. Install sprinklers in suspended ceilings in center of acoustical ceiling panels. Sprinklers may be <br />centered in tile either by hard pipe or with flexible connectors. Connectors shall be UL 2443 <br />listed, Flex Heads Industries or equal. <br />B. Sprinkler Head Location: Sprinkler heads shall be installed no closer than 4 inches to any <br />Ceiling grid or wall. <br />C. Install dry -type sprinklers with water supply from heated space. Do not install pendent or <br />sidewall, wet -type sprinklers in areas subject to freezing. <br />3.7 ESCUTCHEON INSTALLATION <br />A. Install escutcheons for penetrations of walls, ceilings, and floors. <br />B. Escutcheons for Piping: <br />1. Piping with Fitting or Sleeve Protruding from Wall: deep pattern. <br />2. Bare Piping at Wall and Floor Penetrations in Finished Spaces: cast brass with polished <br />chrome -plated finish. <br />3. Bare Piping at Ceiling Penetrations in Finished Spaces cast brass with polished chrome - <br />plated finish. <br />WET -PIPE SPRINKLER SYSTEMS 211313 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.