Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />SECTION 220500 - COMMON WORK RESULTS FOR PLUMBING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes the following: <br />1. Piping materials and installation instructions common to most piping systems. <br />2. Transition fittings. <br />3. Dielectric fittings. <br />4. Sleeves. <br />5. Escutcheons. <br />6. Grout. <br />7. Equipment installation requirements common to equipment sections. <br />8. Painting and finishing. <br />9. Concrete bases. <br />10. Supports and anchorages. <br />1.3 DEFINITIONS <br />Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred <br />spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, <br />unexcavated spaces, crawlspaces, and tunnels. <br />B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied <br />spaces and mechanical equipment rooms. <br />C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient <br />temperatures and weather conditions. Examples include rooftop locations. <br />D. Concealed, Interior Installations: Concealed from view and protected from physical contact by <br />building occupants. Examples include above ceilings and in chases. <br />E. The following are industry abbreviations for plastic materials: <br />1. CPVC: Chlorinated polyvinyl chloride plastic. <br />2. PE: Polyethylene plastic. <br />3. PVC: Polyvinyl chloride plastic. <br />1.4 SUBMITTALS <br />A. Product Data: For the following: <br />COMMON WORK RESULTS FOR PLUMBING 220500 - 1 <br />