My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />F. Install piping to permit valve servicing. Valves located above ceilings shall be positioned no <br />further than arms length away from accessible ceiling opening. <br />G. Install piping at indicated slopes. <br />H. Install piping free of sags and bends. <br />I. Install fittings for changes in direction and branch connections. <br />J. Install piping to allow application of insulation. <br />K. Select system components with pressure rating equal to or greater than system operating <br />pressure. <br />L. Install escutcheons for penetrations of walls, ceilings, and floors according to the following: <br />New Piping: <br />a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep -pattern type. <br />b. Chrome -Plated Piping: One-piece, cast -brass type with polished chrome -plated <br />finish. <br />c. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast - <br />brass type with polished chrome -plated finish. <br />d. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, cast -brass <br />type with polished chrome -plated finish. <br />M. Install sleeves for pipes passing through concrete and masonry walls and concrete floor and <br />roof slabs. <br />Install sleeves for pipes passing through concrete and masonry walls, gypsum -board partitions, <br />and concrete floor and roof slabs. <br />Cut sleeves to length for mounting flush with both surfaces. <br />a. Exception: Extend sleeves installed in floors of mechanical equipment areas or <br />other wet areas 2 inches above finished floor level. Extend cast-iron sleeve fittings <br />below floor slab as required to secure clamping ring if ring is specified. <br />2. Install sleeves in new walls and slabs as new walls and slabs are constructed. <br />3. Install sleeves that are large enough to provide 1/4 -inch annular clear space between <br />sleeve and pipe or pipe insulation. Use the following sleeve materials: <br />a. Steel Pipe Sleeves: For pipes smaller than NPS 6. <br />b. Steel Sheet Sleeves: For pipes NPS 6 and larger, penetrating gypsum -board <br />partitions. <br />4. Except for underground wall penetrations, seal annular space between sleeve and pipe <br />or pipe insulation, using joint sealants appropriate for size, depth, and location of joint. <br />Refer to Division 07 Section "Joint Sealants" for materials and installation. <br />O. Fire -Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at <br />pipe penetrations. Seal pipe penetrations with firestop materials. Refer to Division 07 Section <br />"Penetration Firestopping" for materials. <br />P. Verify final equipment locations for roughing -in. <br />COMMON WORK RESULTS FOR PLUMBING 220500 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.