Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />C. Install plumbing equipment to facilitate service, maintenance, and repair or replacement of <br />components. Connect equipment for ease of disconnecting, with minimum interference to other <br />installations. Extend grease fittings to accessible locations. <br />D. Install equipment to allow right of way for piping installed at required slope. <br />3.5 PAINTING <br />A. Painting of plumbing systems, equipment, and components is specified in Division 09 Sections <br />"Interior Painting" and "Exterior Painting." <br />B. Damage and Touchup: Repair marred and damaged factory -painted finishes with materials and <br />procedures to match original factory finish. <br />3.6 CONCRETE BASES <br />A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's <br />written instructions and according to seismic codes at Project. <br />1. Construct concrete bases of dimensions indicated, but not less than 4 inches larger in <br />both directions than supported unit. <br />2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise <br />indicated, install dowel rods on 18 -inch centers around the full perimeter of the base. <br />3. Install epoxy -coated anchor bolts for supported equipment that extend through concrete <br />base, and anchor into structural concrete floor. <br />4. Place and secure anchorage devices. Use supported equipment manufacturer's setting <br />drawings, templates, diagrams, instructions, and directions furnished with items to be <br />embedded. <br />5. Install anchor bolts to elevations required for proper attachment to supported equipment. <br />6. Install anchor bolts according to anchor -bolt manufacturer's written instructions. <br />7. As specified in Division 03 Section. <br />3.7 GROUTING <br />A. Mix and install grout for plumbing equipment base bearing surfaces, pump and other equipment <br />base plates, and anchors. <br />B. Clean surfaces that will come into contact with grout. <br />C. Provide forms as required for placement of grout. <br />D. Avoid air entrapment during placement of grout. <br />E. Place grout, completely filling equipment bases. <br />F. Place grout on concrete bases and provide smooth bearing surface for equipment. <br />G. Place grout around anchors. <br />COMMON WORK RESULTS FOR PLUMBING 220500 - 7 <br />