My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />D. Pressure Gage: Small, Bourdon -tube insertion type with 2- to 3 -inch- (diameter dial and probe. <br />Dial range shall be at least 0 to 200 psig. <br />E. Carrying Case: Metal or plastic, with formed instrument padding. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. Install thermowells with socket extending to center of pipe and in vertical position in piping tees. <br />B. Install thermowells of sizes required to match thermometer connectors. Include bushings if <br />required to match sizes. <br />C. Install thermowells with extension on insulated piping. <br />D. Fill thermowells with heat -transfer medium. <br />E. Install direct -mounted pressure gages in piping tees with pressure gage located on pipe at the <br />most readable position. <br />F. Install valve and snubber in piping for each pressure gage for fluids. <br />G. Install test plugs in piping tees. <br />H. Install thermometers in the following locations (May not be shown on drawings): <br />1. Inlet and outlet of each water heater. <br />2. Outlet of all master mixing valves. <br />3.2 CONNECTIONS <br />A. Install meters and gages adjacent to machines and equipment to allow service and <br />maintenance of meters, gages, machines, and equipment. <br />3.3 ADJUSTING <br />A. Adjust faces of meters and gages to proper angle for best visibility. <br />3.4 THERMOMETER SCALE -RANGE SCHEDULE <br />A. Scale Range for Domestic Hot -Water Piping: 0 to 250 deg F. <br />3.5 PRESSURE -GAGE SCALE -RANGE SCHEDULE <br />A. Scale Range for Water Service Piping: 0 to 160 psi. <br />METERS AND GAGES FOR PLUMBING PIPING 220519 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.