My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove <br />special packing materials, such as blocks, used to prevent disc movement during shipping and <br />handling. <br />B. Operate valves in positions from fully open to fully closed. Examine guides and seats made <br />accessible by such operations. <br />C. Examine threads on valve and mating pipe for form and cleanliness. <br />D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper <br />size, length, and material. Verify that gasket is of proper size, that its material composition is <br />suitable for service, and that it is free from defects and damage. <br />E. Do not attempt to repair defective valves; replace with new valves. <br />3.2 VALVE INSTALLATION <br />A. Install valves with unions or flanges at each piece of equipment arranged to allow service, <br />maintenance, and equipment removal without system shutdown. <br />B. Locate valves for easy access and provide separate support where necessary. <br />C. Install valves in horizontal piping with stem at or above center of pipe. <br />D. Install valves in position to allow full stem movement. <br />E. Install check valves for proper direction of flow and as follows: <br />1. Swing Check Valves: In horizontal position with hinge pin level. <br />2. Lift Check Valves: With stem upright and plumb. <br />3.3 ADJUSTING <br />A. Adjust or replace valve packing after piping systems have been tested and put into service but <br />before final adjusting and balancing. Replace valves if persistent leaking occurs. <br />3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS <br />A. If valve applications are not indicated, use the following: <br />1. Shutoff Service: Ball or gate valves. <br />2. Pump -Discharge Check Valves: <br />a. NPS 2 and Smaller: Bronze swing check valves with bronze or nonmetallic disc. <br />GENERAL -DUTY VALVES FOR PLUMBING PIPING 220523 <br />
The URL can be used to link to this page
Your browser does not support the video tag.