Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />A. General: Submit listed submittals in accordance with Conditions of the Contract and Division <br />01 Submittal Procedure Section(s). <br />B. Product Data: Submit product data, including manufacturer's technical specifications, for each <br />type of specified products. <br />C. Shop Drawings: Submit shop drawings showing layout, pattern and colors. <br />D. Samples: Submit selection and verification samples for finish and colors. <br />E. Quality Assurance/Control Submittals: Submit the following: <br />1. Test Reports: Upon request, submit test reports of physical performance and <br />characteristics from recognized test laboratories. <br />2. Technical Specifications: Submit manufacturer's technical specification document that <br />certifies products meet or exceed specified requirements. <br />3. Manufacturer's Instructions: Submit manufacturer's installation instructions for resilient <br />flooring. <br />F. Closeout Submittals: Submit the following: <br />1. Maintenance Data: Maintenance data for installed products in accordance with Division <br />01 Closeout Submittals, Maintenance Data and Operation Data Section. Include methods <br />for maintaining installed products and precautions against cleaning materials and <br />methods detrimental to finishes and performance. <br />2. Warranty: Submit warranty documents specified herein. <br />1.05 QUALITY ASSURANCE <br />A. Manufacturer: The manufacturer of the flooring product must be accredited to both ISO 9001 <br />(Quality Management System) and ISO 14001 (Environmental Management System). <br />B. Flooring Contractor Qualifications: <br />1. The awarded contractor shall be an established firm with experience in the installation of <br />the specified product and have access to all manufacturers' required technical, <br />maintenance, specifications and related documents. <br />2. The flooring contractor shall have completed at least 3 projects of similar scope, material <br />and complexity, and must provide project reference details including contact names and <br />telephone numbers. <br />C. Installer Qualifications: An experienced installer, as determined by contractor, who has <br />specialized in the installation of work similar to that required for this project is to perform the <br />work of this section. <br />1. Installation procedures should be in strict accordance with Amtico International <br />published technical documentation and shall not begin until the work of all other trades <br />has been completed. <br />RESILIENT TILE FLOORING 096519-3 <br />