Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />7. Fasteners: Stainless-steel rivets or self -tapping screws. <br />8. Adhesive: Contact -type permanent adhesive, compatible with label and with substrate. <br />B. Label Content: Include equipment's Drawing designation or unique equipment number, <br />Drawing numbers where equipment is indicated (plans, details, and schedules), plus the <br />Specification Section number and title where equipment is specified. <br />C. Equipment Label Schedule: For each item of equipment to be labeled, on 8 -1/2 -by -11 -inch <br />bond paper. Tabulate equipment identification number and identify Drawing numbers where <br />equipment is indicated (plans, details, and schedules), plus the Specification Section number <br />and title where equipment is specified. Equipment schedule shall be included in operation and <br />maintenance data. <br />2.2 PIPE LABELS <br />A. General Requirements for Manufactured Pipe Labels: Preprinted, color -coded, with lettering <br />indicating service, and showing flow direction. <br />B. Pretensioned Pipe Labels: Precoiled, semi-rigid plastic formed to partially cover circumference <br />of pipe and to attach to pipe without fasteners or adhesive. <br />C. Pipe Label Contents: Include identification of piping service using same designations or <br />abbreviations as used on Drawings and an arrow indicating flow direction. <br />Flow -Direction Arrows: Integral with piping system service lettering to accommodate both <br />directions, or as separate unit on each pipe label to indicate flow direction. <br />Lettering Size: At least 1-1/2 inches high. <br />2.3 VALVE TAGS <br />A. Valve Tags: Stamped or engraved with 1/4 -inch letters for piping system abbreviation and 1/2 - <br />inch numbers. <br />1. Tag Material: Brass, 0.032 -inch or Stainless steel, 0.025 -inch minimum thickness, and <br />having predrilled or stamped holes for attachment hardware. <br />2. Fasteners: Brass wire -link or beaded chain or S -hook. <br />B. Valve Schedules: For each piping system, on 8 -1/2 -by -11 -inch bond paper. Tabulate valve <br />number, piping system, system abbreviation (as shown on valve tag), location of valve (room or <br />space), normal -operating position (open, closed, or modulating), and variations for identification. <br />Mark valves for emergency shutoff and similar special uses. <br />1. Valve -tag schedule shall be included in operation and maintenance data. <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />Clean piping and equipment surfaces of substances that could impair bond of identification <br />devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and <br />encapsulants. <br />IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553 - 2 <br />