My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, <br />with appropriate markings of applicable testing and inspecting agency. <br />1. Insulation Installed Indoors: Flame -spread index of 25 or less, and smoke -developed <br />index of 50 or less. <br />1.5 DELIVERY, STORAGE, AND HANDLING <br />A. Packaging: Insulation material containers shall be marked by manufacturer with appropriate <br />ASTM standard designation, type and grade, and maximum use temperature. <br />1.6 COORDINATION <br />A. Coordinate size and location of supports, hangers, and insulation shields specified in <br />Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment." <br />B. Coordinate clearance requirements with piping Installer for piping insulation application and <br />equipment Installer for equipment insulation application. Before preparing piping Shop <br />Drawings, establish and maintain clearance requirements for installation of insulation and field- <br />appliedjackets and finishes and for space required for maintenance. <br />C. Coordinate installation and testing of heat tracing. <br />1.7 SCHEDULING <br />A. Schedule insulation application after pressure testing systems and, where required, after <br />installing and testing heat tracing. Insulation application may begin on segments that have <br />satisfactory test results. <br />B. Complete installation and concealment of plastic materials as rapidly as possible in each area of <br />construction. <br />PART 2 - PRODUCTS <br />2.1 INSULATION MATERIALS <br />A. Comply with requirements in Part 3 schedule articles for where insulating materials shall be <br />applied. <br />B. Products shall not contain asbestos, lead, mercury, or mercury compounds. <br />C. Flexible Elastomeric: Closed -cell, sponge- or expanded -rubber materials. Comply with <br />ASTM C 534, Type 1 for tubular materials and Type II for sheet materials. <br />Products: Subject to compliance with requirements, provide one of the following: <br />a. Aeroflex USA Inc.; Aerocel. <br />b. Armacell LLC; AP Armaflex. <br />c. RBX Corporation; Insul-Sheet 1800 and Insul-Tube 180. <br />PLUMBING INSULATION 220700 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.