My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />K. Apply adhesives, mastics, and sealants at manufacturer's recommended coverage rate and wet <br />and dry film thicknesses. <br />L. Install insulation with factory -applied jackets as follows: <br />1. Draw jacket tight and smooth. <br />2. Cover joints and seams with tape as recommended by insulation material manufacturer <br />to maintain vapor seal. <br />3. Where vapor barriers are indicated, apply vapor -barrier mastic on seams and joints and <br />at ends adjacent to pipe flanges and fittings. <br />M. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal <br />thickness. <br />N. Finish installation with systems at operating conditions. Repair joint separations and cracking <br />due to thermal movement. <br />O. Repair damaged insulation facings by applying same facing material over damaged areas. <br />Extend patches at least 4 inches beyond damaged areas. Adhere and seal patches similar to <br />butt joints. <br />P. For above ambient services, do not install insulation to the following: <br />1. Vibration -control devices. <br />2. Testing agency labels and stamps. <br />3. Nameplates and data plates. <br />4. Manholes. <br />5. Handholes. <br />6. Cleanouts. <br />3.4 PENETRATIONS <br />A. Insulation Installation at Aboveground Exterior Wall Penetrations: Install insulation continuously <br />through wall penetrations. <br />1. Seal penetrations with flashing sealant. <br />2. For applications requiring only indoor insulation, terminate insulation inside wall surface <br />and seal with joint sealant. <br />3. Seal jacket to wall flashing with flashing sealant. <br />B. Insulation Installation at Interior Wall and Partition Penetrations (That Are Not Fire Rated): <br />Install insulation continuously through walls and partitions. <br />C. Insulation Installation at Fire -Rated Wall and Partition Penetrations: Install insulation <br />continuously through penetrations of fire -rated walls and partitions. <br />1. Comply with requirements in Division 07 Section "Penetration Firestopping" for <br />firestopping and fire -resistive joint sealers. <br />PLUMBING INSULATION 220700 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.